Pipeline construction method
The invention provides a pipeline construction method, which belongs to the technical field of pipeline construction, and comprises the following steps: digging a groove; a cushion layer laying machine is arranged in the groove, a discharging assembly is arranged at the front end of the cushion layer laying machine, and a compacting assembly is arranged at the rear end of the cushion layer laying machine; and a pipeline pushing mechanism is arranged in the groove and located behind the cushion layer laying machine, the multiple sections of pipelines are sequentially pushed in the direction of the cushion layer laying machine through the pipeline pushing mechanism, and therefore the cushion layer laying machine is driven by the pipeline pushing mechanism to move forwards. According to the pipeline construction method, the pipeline pushing mechanism and the cushion layer laying machine are matched through splicing movement of the pipeline, movement of the pipeline serves as power of the cushion layer laying machine, cushion layer construction and pipeline laying are completed synchronously, the construction period is shortened, and the construction progress is accelerated.
本发明提供一种管道施工方法,属于管道施工技术领域,包括以下步骤:开挖沟槽;将垫层铺设机设置于所述沟槽内,所述垫层铺设机的前端具有出料组件,所述垫层铺设机的后端具有压实组件;将管道顶推机构设置于所述沟槽内,并位于所述垫层铺设机的后方,通过所述管道顶推机构将多节管道依次朝向所述垫层铺设机的方向进行顶进,从而通过所述管道顶推机构驱动所述垫层铺设机朝向前方移动。本发明提供的管道施工方法,管道顶推机构和垫层铺设机通过管道的拼接移动进行配合,管道的移动充当垫层铺设机的动力,垫层施工和管道铺设同步完成,降低了施工周期,加快了施工进度。
Pipeline construction method
The invention provides a pipeline construction method, which belongs to the technical field of pipeline construction, and comprises the following steps: digging a groove; a cushion layer laying machine is arranged in the groove, a discharging assembly is arranged at the front end of the cushion layer laying machine, and a compacting assembly is arranged at the rear end of the cushion layer laying machine; and a pipeline pushing mechanism is arranged in the groove and located behind the cushion layer laying machine, the multiple sections of pipelines are sequentially pushed in the direction of the cushion layer laying machine through the pipeline pushing mechanism, and therefore the cushion layer laying machine is driven by the pipeline pushing mechanism to move forwards. According to the pipeline construction method, the pipeline pushing mechanism and the cushion layer laying machine are matched through splicing movement of the pipeline, movement of the pipeline serves as power of the cushion layer laying machine, cushion layer construction and pipeline laying are completed synchronously, the construction period is shortened, and the construction progress is accelerated.
本发明提供一种管道施工方法,属于管道施工技术领域,包括以下步骤:开挖沟槽;将垫层铺设机设置于所述沟槽内,所述垫层铺设机的前端具有出料组件,所述垫层铺设机的后端具有压实组件;将管道顶推机构设置于所述沟槽内,并位于所述垫层铺设机的后方,通过所述管道顶推机构将多节管道依次朝向所述垫层铺设机的方向进行顶进,从而通过所述管道顶推机构驱动所述垫层铺设机朝向前方移动。本发明提供的管道施工方法,管道顶推机构和垫层铺设机通过管道的拼接移动进行配合,管道的移动充当垫层铺设机的动力,垫层施工和管道铺设同步完成,降低了施工周期,加快了施工进度。
Pipeline construction method
一种管道施工方法
CHEN XIAOLONG (author) / PENG SHOUHAI (author) / WANG WANQIONG (author) / LI JIAYING (author) / MI RONGXI (author) / LIU LONGZHI (author) / ZHOU XIAOGUO (author) / HUI ERQING (author) / LI ZHONGMING (author)
2023-11-21
Patent
Electronic Resource
Chinese
PIPELINE CONSTRUCTION STRUCTURE AND PIPELINE CONSTRUCTION METHOD
European Patent Office | 2021
|International Pipeline Construction Report - Pipeline Construction Scorecard
Online Contents | 2004
PIPELINE STRUCTURE AND PIPELINE RENEWAL CONSTRUCTION METHOD
European Patent Office | 2023
|