Urban interchange ramp pile foundation all-casing all-slewing drilling machine dismantling construction method
The invention relates to the technical field of building construction, in particular to an urban interchange ramp pile foundation all-casing all-slewing drilling machine dismantling construction method which comprises the following steps: pile position lofting; laying a working platform; drilling machine equipment is in place after the working platform is laid; pressing down the steel sleeve; the wedge-shaped hammer is embedded; rotating to twist off the old pile; pulling out the twisted-off old pile; the punching grab bucket grabs and exposes the lower-section pile head; impact grabbing ensures thorough obstacle removal; the old pile pulling construction is completed through backfilling and pipe pulling; the urban interchange ramp pile foundation all-sleeve all-rotation drilling machine dismantling construction method has the beneficial effects that the steel sleeve is used, the all-rotation sleeve drilling machine is used for conducting pile pulling operation construction on the cast-in-place concrete pile, the steel sleeve has two functions, on one hand, torque and press-in force provided by top driving equipment are transmitted to the tool bit, and on the other hand, the steel sleeve is used for conducting pile pulling operation on the cast-in-place concrete pile; meanwhile, the effects of supporting the hole wall and preventing the hole wall from collapsing are achieved in the drilling process, and the length of the steel sleeve is 26 m; and a 100t crawler crane is arranged for construction.
本发明涉及建筑施工技术领域,具体为城市立交匝道桩基全套管全回转钻机拆除施工方法,包括以下步骤:桩位放样;铺设工作平台;工作平台铺设完成后进行钻机设备就位;钢套管下压;楔形锤嵌入;回转扭断旧桩;拔除扭断旧桩;冲抓斗抓取、外漏下段桩头;冲抓确保清障彻底;回填拔管完成旧桩拔除施工;有益效果为:本发明提出的城市立交匝道桩基全套管全回转钻机拆除施工方法,使用钢套管,采用全回转套管钻机对混凝土灌注桩进行拔桩作业施工,钢套管有两方面功能,一方面将顶部驱动设备提供的扭矩和压入力传递给刀头,同时在钻进的过程中还起到支护孔壁、防止孔壁坍塌的作用,钢套管长度为26m;并配备100t履带式起重机进行施工。
Urban interchange ramp pile foundation all-casing all-slewing drilling machine dismantling construction method
The invention relates to the technical field of building construction, in particular to an urban interchange ramp pile foundation all-casing all-slewing drilling machine dismantling construction method which comprises the following steps: pile position lofting; laying a working platform; drilling machine equipment is in place after the working platform is laid; pressing down the steel sleeve; the wedge-shaped hammer is embedded; rotating to twist off the old pile; pulling out the twisted-off old pile; the punching grab bucket grabs and exposes the lower-section pile head; impact grabbing ensures thorough obstacle removal; the old pile pulling construction is completed through backfilling and pipe pulling; the urban interchange ramp pile foundation all-sleeve all-rotation drilling machine dismantling construction method has the beneficial effects that the steel sleeve is used, the all-rotation sleeve drilling machine is used for conducting pile pulling operation construction on the cast-in-place concrete pile, the steel sleeve has two functions, on one hand, torque and press-in force provided by top driving equipment are transmitted to the tool bit, and on the other hand, the steel sleeve is used for conducting pile pulling operation on the cast-in-place concrete pile; meanwhile, the effects of supporting the hole wall and preventing the hole wall from collapsing are achieved in the drilling process, and the length of the steel sleeve is 26 m; and a 100t crawler crane is arranged for construction.
本发明涉及建筑施工技术领域,具体为城市立交匝道桩基全套管全回转钻机拆除施工方法,包括以下步骤:桩位放样;铺设工作平台;工作平台铺设完成后进行钻机设备就位;钢套管下压;楔形锤嵌入;回转扭断旧桩;拔除扭断旧桩;冲抓斗抓取、外漏下段桩头;冲抓确保清障彻底;回填拔管完成旧桩拔除施工;有益效果为:本发明提出的城市立交匝道桩基全套管全回转钻机拆除施工方法,使用钢套管,采用全回转套管钻机对混凝土灌注桩进行拔桩作业施工,钢套管有两方面功能,一方面将顶部驱动设备提供的扭矩和压入力传递给刀头,同时在钻进的过程中还起到支护孔壁、防止孔壁坍塌的作用,钢套管长度为26m;并配备100t履带式起重机进行施工。
Urban interchange ramp pile foundation all-casing all-slewing drilling machine dismantling construction method
城市立交匝道桩基全套管全回转钻机拆除施工方法
REN JIE (author) / CHEN SHEN (author) / YAO QIHAI (author) / TANG RUI (author) / WANG YIXIAN (author) / WANG KAI (author) / QIAN CHENG (author) / HE BINGYIN (author) / WANG ZHONGEN (author)
2023-12-05
Patent
Electronic Resource
Chinese
Construction method for pipe-following drilling micro pile of slewing drilling machine
European Patent Office | 2015
|Double-casing all-slewing super-long pile construction tool and construction method
European Patent Office | 2020
|Full-casing full-slewing drilling machine hole-forming process
European Patent Office | 2021
|Pile pulling construction method of hydraulic full-sleeve full-slewing drilling machine
European Patent Office | 2024
|European Patent Office | 2023
|