Modular construction method for prefabricated pipe gallery structure
The invention discloses a modular construction method for a prefabricated pipe gallery structure. The modular construction method comprises the following steps that S1, a plurality of sections of reinforced concrete pipe gallery column and pipe gallery beam integrated structures are prefabricated; s2, a foundation pit construction bearing platform is excavated, and a plurality of cup openings arranged at intervals are formed in the bearing platform; s3, the pipe gallery column and pipe gallery beam integrated structure is integrally hoisted, and the bottom of the pipe gallery column and pipe gallery beam integrated structure enters a cup opening to be fixed in place; s4, the step S3 is repeated to complete installation of the next pipe gallery column and pipe gallery beam integrated structure; and S5, concrete is poured at an abutted seam between the adjacent pipe gallery column and pipe gallery beam integrated structure. On the basis that the construction efficiency and the construction quality are guaranteed, the construction cost is further reduced, the construction period is shortened, the construction progress is guaranteed, and the problems of construction waste, construction site moisture, flying dust pollution and the like in engineering construction can be effectively controlled.
本发明公开了一种预制管廊结构模块化施工方法,包括以下步骤:S1、预制若干节段钢筋混凝土的管廊柱和管廊梁一体化结构;S2、开挖基坑施工承台、在承台上形成若干间隔设置的杯口;S3、将管廊柱和管廊梁一体化结构整体吊装,使管廊柱和管廊梁一体化结构的底部进入杯口就位固定;S4、重复步骤S3完成下一节管廊柱和管廊梁一体化结构的安装;S5、相邻管廊柱和管廊梁一体化结构之间拼缝处浇筑混凝土。本发明可以在保证建设效率及建设质量的基础上,进一步降低建设成本,缩短工期,保证建设进度,且能够对工程建设中的建筑垃圾、工地潮湿、扬尘污染等问题进行有效控制。
Modular construction method for prefabricated pipe gallery structure
The invention discloses a modular construction method for a prefabricated pipe gallery structure. The modular construction method comprises the following steps that S1, a plurality of sections of reinforced concrete pipe gallery column and pipe gallery beam integrated structures are prefabricated; s2, a foundation pit construction bearing platform is excavated, and a plurality of cup openings arranged at intervals are formed in the bearing platform; s3, the pipe gallery column and pipe gallery beam integrated structure is integrally hoisted, and the bottom of the pipe gallery column and pipe gallery beam integrated structure enters a cup opening to be fixed in place; s4, the step S3 is repeated to complete installation of the next pipe gallery column and pipe gallery beam integrated structure; and S5, concrete is poured at an abutted seam between the adjacent pipe gallery column and pipe gallery beam integrated structure. On the basis that the construction efficiency and the construction quality are guaranteed, the construction cost is further reduced, the construction period is shortened, the construction progress is guaranteed, and the problems of construction waste, construction site moisture, flying dust pollution and the like in engineering construction can be effectively controlled.
本发明公开了一种预制管廊结构模块化施工方法,包括以下步骤:S1、预制若干节段钢筋混凝土的管廊柱和管廊梁一体化结构;S2、开挖基坑施工承台、在承台上形成若干间隔设置的杯口;S3、将管廊柱和管廊梁一体化结构整体吊装,使管廊柱和管廊梁一体化结构的底部进入杯口就位固定;S4、重复步骤S3完成下一节管廊柱和管廊梁一体化结构的安装;S5、相邻管廊柱和管廊梁一体化结构之间拼缝处浇筑混凝土。本发明可以在保证建设效率及建设质量的基础上,进一步降低建设成本,缩短工期,保证建设进度,且能够对工程建设中的建筑垃圾、工地潮湿、扬尘污染等问题进行有效控制。
Modular construction method for prefabricated pipe gallery structure
预制管廊结构模块化施工方法
PENG FEI (author) / ZHANG QINGZE (author) / LIU ZHIJIANG (author)
2023-12-12
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2022
|Pipe gallery prefabricated installation construction method
European Patent Office | 2020
|Prefabricated comprehensive pipe gallery structure and construction method
European Patent Office | 2024
|Pipe gallery prefabricated members and prefabricated comprehensive pipe gallery
European Patent Office | 2016
|