Construction method for replacing concrete floor slab with existing wood floor slab
The invention discloses a construction method for replacing a concrete floor slab with an existing wood floor slab, which mainly comprises the following steps of: dividing an existing wood floor slab structure part, which needs to be replaced, of a wood structure building into a plurality of replacement construction blocks, then grouping each replacement construction block, and dividing a pre-replacement unit and a post-replacement unit in the same group, the problem that the structure of a wood structure building is unstable due to the fact that all wood floors are dismantled is avoided, use of a large number of building equipment is avoided through the block building, wood floors are dismantled and poured in sequence, the building structure cannot be damaged too much, meanwhile, part of existing wood structures are reserved to serve as a foundation support and a construction face, construction of a pouring platform is reduced, and the construction cost is reduced. And meanwhile, multi-point simultaneous pouring can be achieved, and construction is convenient. The concrete floors are used for replacing wood floors in blocks, each concrete floor exists independently, and the later processing of the existing concrete floors in the later period is not delayed, such as archaizing or wood-imitating or anchoring, and the processing construction progress.
本发明公开了一种混凝土楼板换置既有木楼板施工方法,主要如下:将木结构建筑物所需要置换的既有木楼板结构部分划分为多个置换施工区块,然后再对每个置换施工区块进行分组并在同组中划分出先置换单元和后置换单元,避免将所有的木楼板都拆除导致木结构建筑结构不稳的问题,分区块建筑也避免了大量建筑设备的使用,先后拆除木楼板和先后浇筑,不会过大的破坏建筑结构,同时也保留已有的部分木结构作为基础支撑和施工面,减少浇筑平台的搭建,并方便浇筑模板的搭建,同时可以多点同时浇筑,方便施工。混凝土楼板分区块置换木楼板,每块混凝土楼板独立存在,不耽误后期对已有混凝土楼板的后期加工,比如仿古或者仿木或者锚固等处理,加工施工进度。
Construction method for replacing concrete floor slab with existing wood floor slab
The invention discloses a construction method for replacing a concrete floor slab with an existing wood floor slab, which mainly comprises the following steps of: dividing an existing wood floor slab structure part, which needs to be replaced, of a wood structure building into a plurality of replacement construction blocks, then grouping each replacement construction block, and dividing a pre-replacement unit and a post-replacement unit in the same group, the problem that the structure of a wood structure building is unstable due to the fact that all wood floors are dismantled is avoided, use of a large number of building equipment is avoided through the block building, wood floors are dismantled and poured in sequence, the building structure cannot be damaged too much, meanwhile, part of existing wood structures are reserved to serve as a foundation support and a construction face, construction of a pouring platform is reduced, and the construction cost is reduced. And meanwhile, multi-point simultaneous pouring can be achieved, and construction is convenient. The concrete floors are used for replacing wood floors in blocks, each concrete floor exists independently, and the later processing of the existing concrete floors in the later period is not delayed, such as archaizing or wood-imitating or anchoring, and the processing construction progress.
本发明公开了一种混凝土楼板换置既有木楼板施工方法,主要如下:将木结构建筑物所需要置换的既有木楼板结构部分划分为多个置换施工区块,然后再对每个置换施工区块进行分组并在同组中划分出先置换单元和后置换单元,避免将所有的木楼板都拆除导致木结构建筑结构不稳的问题,分区块建筑也避免了大量建筑设备的使用,先后拆除木楼板和先后浇筑,不会过大的破坏建筑结构,同时也保留已有的部分木结构作为基础支撑和施工面,减少浇筑平台的搭建,并方便浇筑模板的搭建,同时可以多点同时浇筑,方便施工。混凝土楼板分区块置换木楼板,每块混凝土楼板独立存在,不耽误后期对已有混凝土楼板的后期加工,比如仿古或者仿木或者锚固等处理,加工施工进度。
Construction method for replacing concrete floor slab with existing wood floor slab
一种混凝土楼板换置既有木楼板施工方法
GAO ZHIGANG (author) / SHEN WEIMING (author) / YANG HUAIZHENG (author)
2023-12-15
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
FLOOR SLAB REPLACING STRUCTURE AND FLOOR SLAB REPLACING METHOD