A platform for research: civil engineering, architecture and urbanism
EXISTING FLOOR SLAB REPLACING METHOD
To provide an existing floor slab replacing method that solves the problems of the conventional technology, e.g., the height of a steel slab can be easily adjusted when installing a new steel slab on an existing main girder after removing an RC slab.SOLUTION: An existing floor slab replacing method of the present invention is a method for replacing a concrete slab with a steel slab, comprising an existing floor slab cutting step, an existing floor slab removal step, a support flange drilling step, a steel slab installation step, and a filling process. At the steel slab installation step, a steel slab is arranged so that an isolation is formed between a steel slab flange and a support flange. The isolation is formed by placing an adjustment nut attached to a vertical coupling bold on the support flange, and the steel slab flange is arranged on the support flange while adjusting the size of the isolation using the adjusting nut.SELECTED DRAWING: Figure 4
【課題】本願発明の課題は、従来技術が抱える問題を解決することであり、すなわち、RC床版撤去後の既設主桁に新設の鋼床版を設置するにあたって、容易に鋼床版の高さ調整を行うことができる既設床版取替え方法を提供することにある。【解決手段】本願発明の既設床版取替え方法は、コンクリート床版を鋼床版に取り替える方法であって、既設床版切断工程と既設床版撤去工程、支持フランジ穿孔工程、鋼床版設置工程、充填工程を備えた方法である。鋼床版設置工程では、鋼床版フランジと支持フランジとの間に離隔が形成されるように鋼床版を配置する。なお離隔は、上下連結ボルトに取り付けられた調整ナットを支持フランジ上に載置することによって形成され、調整ナットを用いて離隔の寸法を調整しながら鋼床版フランジを支持フランジ上に配置する。【選択図】図4
EXISTING FLOOR SLAB REPLACING METHOD
To provide an existing floor slab replacing method that solves the problems of the conventional technology, e.g., the height of a steel slab can be easily adjusted when installing a new steel slab on an existing main girder after removing an RC slab.SOLUTION: An existing floor slab replacing method of the present invention is a method for replacing a concrete slab with a steel slab, comprising an existing floor slab cutting step, an existing floor slab removal step, a support flange drilling step, a steel slab installation step, and a filling process. At the steel slab installation step, a steel slab is arranged so that an isolation is formed between a steel slab flange and a support flange. The isolation is formed by placing an adjustment nut attached to a vertical coupling bold on the support flange, and the steel slab flange is arranged on the support flange while adjusting the size of the isolation using the adjusting nut.SELECTED DRAWING: Figure 4
【課題】本願発明の課題は、従来技術が抱える問題を解決することであり、すなわち、RC床版撤去後の既設主桁に新設の鋼床版を設置するにあたって、容易に鋼床版の高さ調整を行うことができる既設床版取替え方法を提供することにある。【解決手段】本願発明の既設床版取替え方法は、コンクリート床版を鋼床版に取り替える方法であって、既設床版切断工程と既設床版撤去工程、支持フランジ穿孔工程、鋼床版設置工程、充填工程を備えた方法である。鋼床版設置工程では、鋼床版フランジと支持フランジとの間に離隔が形成されるように鋼床版を配置する。なお離隔は、上下連結ボルトに取り付けられた調整ナットを支持フランジ上に載置することによって形成され、調整ナットを用いて離隔の寸法を調整しながら鋼床版フランジを支持フランジ上に配置する。【選択図】図4
EXISTING FLOOR SLAB REPLACING METHOD
既設床版取替え方法
ISHII HIROFUMI (author) / IGUCHI SUSUMU (author) / SHIROMIZU AKIO (author)
2021-03-25
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
Construction method for replacing concrete floor slab with existing wood floor slab
European Patent Office | 2023
|FLOOR SLAB REPLACING STRUCTURE AND FLOOR SLAB REPLACING METHOD
European Patent Office | 2023
|