The invention relates to a 35-meter ultra-wide road construction process. The 35-meter ultra-wide road construction process is characterized by comprising the following steps of S1, construction preparation, S2, formwork erecting, S3, concrete reinforcing mesh binding and placing, S4, concrete pouring and S5, curing. The construction blocks are reasonably divided for sequential construction, the problem that one-time pouring cannot be achieved and is affected by the physical performance of concrete is solved, and the overall stability of the concrete surface layer is guaranteed.
本发明涉及一种35米超宽道路施工工艺,其特征在于:包括以下步骤:S1:施工准备、S2:模板支立、S3:混凝土钢筋网绑扎及放置、S4:混凝土浇筑、S5:养护。本发明通过合理划分施工块进行依次施工,解决了无法一次性浇筑而受混凝土物理性能影响的问题,保证了混凝土面层的整体的稳定性。
The invention relates to a 35-meter ultra-wide road construction process. The 35-meter ultra-wide road construction process is characterized by comprising the following steps of S1, construction preparation, S2, formwork erecting, S3, concrete reinforcing mesh binding and placing, S4, concrete pouring and S5, curing. The construction blocks are reasonably divided for sequential construction, the problem that one-time pouring cannot be achieved and is affected by the physical performance of concrete is solved, and the overall stability of the concrete surface layer is guaranteed.
本发明涉及一种35米超宽道路施工工艺,其特征在于:包括以下步骤:S1:施工准备、S2:模板支立、S3:混凝土钢筋网绑扎及放置、S4:混凝土浇筑、S5:养护。本发明通过合理划分施工块进行依次施工,解决了无法一次性浇筑而受混凝土物理性能影响的问题,保证了混凝土面层的整体的稳定性。
Construction process for 35-meter ultra-wide road
一种35米超宽道路施工工艺
JIANG BIN (author)
2023-12-19
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE