The invention relates to the field of road construction, in particular to a road construction technology. Comprising the following steps: S1, carrying out survey work, and determining various parameters of a road; s2, the foundation of the road is compacted, and the bearing capacity of the foundation is ensured; s3, mounting the construction device on a vehicle, and moving the construction device to the road; s4, a base material is laid on the road through the construction device; s5, a layer of asphalt concrete is laid on the upper side of the base material through the construction device, so that the middle of the road is high, and the two sides are low; and S6, the asphalt concrete is compacted through a road roller. The parameters are width and gradient. The base layer is made of broken stones and gravels. Drainage ditches are formed in the two sides of the road after the step S6. During construction, a road can be high in the middle and low in two sides, and water accumulation on the road is prevented.
本发明涉及道路施工领域,更具体的说是一种道路施工工艺。包括以下步骤:S1:进行勘测工作,确定道路的各项参数;S2:对道路的地基进行压实,确保地基承载能力;S3:将施工装置安装在车辆上,将施工装置移动至道路上;S4:通过施工装置向道路上铺设基层材料;S5:通过施工装置向基层材料的上侧铺设一层沥青混凝土,使得道路中间高、两侧低;S6:通过压路机将沥青混凝土压实。所述参数为宽度和坡度。所述基层材料为碎石和砂石。所述S6后在道路两侧设置排水沟。可以在施工时使道路中间高、两侧低,防止道路积水。
Road construction process
The invention relates to the field of road construction, in particular to a road construction technology. Comprising the following steps: S1, carrying out survey work, and determining various parameters of a road; s2, the foundation of the road is compacted, and the bearing capacity of the foundation is ensured; s3, mounting the construction device on a vehicle, and moving the construction device to the road; s4, a base material is laid on the road through the construction device; s5, a layer of asphalt concrete is laid on the upper side of the base material through the construction device, so that the middle of the road is high, and the two sides are low; and S6, the asphalt concrete is compacted through a road roller. The parameters are width and gradient. The base layer is made of broken stones and gravels. Drainage ditches are formed in the two sides of the road after the step S6. During construction, a road can be high in the middle and low in two sides, and water accumulation on the road is prevented.
本发明涉及道路施工领域,更具体的说是一种道路施工工艺。包括以下步骤:S1:进行勘测工作,确定道路的各项参数;S2:对道路的地基进行压实,确保地基承载能力;S3:将施工装置安装在车辆上,将施工装置移动至道路上;S4:通过施工装置向道路上铺设基层材料;S5:通过施工装置向基层材料的上侧铺设一层沥青混凝土,使得道路中间高、两侧低;S6:通过压路机将沥青混凝土压实。所述参数为宽度和坡度。所述基层材料为碎石和砂石。所述S6后在道路两侧设置排水沟。可以在施工时使道路中间高、两侧低,防止道路积水。
Road construction process
一种道路施工工艺
CHEN SONGQI (author) / WANG PENG (author) / YAN XINGYUAN (author)
2024-03-26
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE