A platform for research: civil engineering, architecture and urbanism
Bridge span dismantling system and dismantling method for single-pier-stud bridge
The invention discloses a bridge span dismantling system and dismantling method for a single pier column bridge, the bridge span dismantling system comprises an unloading bearing platform, an unloading module and a guide module, the unloading bearing platform is arranged on the bottom surface of a bridge span of the single pier column bridge to be dismantled and is used for bearing the bridge span to be dismantled; the unloading module comprises a lifting mechanism and a bearing plate, the lifting mechanism is arranged below the unloading bearing platform and used for lifting or unloading the unloading bearing platform, and the bearing plate is installed at the bottom of the lifting mechanism; the guide module comprises a guide rail and a guide pulley, the guide rail is mounted on a pier of a to-be-dismounted single pier column bridge, and the guide pulley is mounted on the unloading bearing platform in a manner of sliding along a guide slide rail so as to guide the unloading bearing platform; according to the bridge span dismantling system, after the bridge span is unloaded to the ground or the specified height through the bridge span dismantling system, the bridge span is decomposed and dismantled, dust pollution is effectively reduced, and the bridge span dismantling system is more environmentally friendly.
本发明公开了一种用于单墩柱桥的桥跨拆除系统及拆除方法,包括卸落承重平台、卸落模块和导向模块,卸落承重平台设置于待拆除的单墩柱桥的桥跨的底面,用于承托待拆除的桥跨;卸落模块包括升降机构和承载板,升降机构设置于卸落承重平台的下方用于升举或卸落卸落承重平台,承载板安装于升降机构的底部;导向模块包括导向轨道和导向滑轮,导向轨道安装于待拆除的单墩柱桥的桥墩,导向滑轮以可沿导向滑轨滑动的方式安装于卸落承重平台,以形成对卸落承重平台的导向;本发明通过桥跨拆除系统将桥跨卸落至地面或指定高度后,再对其进行分解和拆除,有效减少粉尘污染,对环境更为友好。
Bridge span dismantling system and dismantling method for single-pier-stud bridge
The invention discloses a bridge span dismantling system and dismantling method for a single pier column bridge, the bridge span dismantling system comprises an unloading bearing platform, an unloading module and a guide module, the unloading bearing platform is arranged on the bottom surface of a bridge span of the single pier column bridge to be dismantled and is used for bearing the bridge span to be dismantled; the unloading module comprises a lifting mechanism and a bearing plate, the lifting mechanism is arranged below the unloading bearing platform and used for lifting or unloading the unloading bearing platform, and the bearing plate is installed at the bottom of the lifting mechanism; the guide module comprises a guide rail and a guide pulley, the guide rail is mounted on a pier of a to-be-dismounted single pier column bridge, and the guide pulley is mounted on the unloading bearing platform in a manner of sliding along a guide slide rail so as to guide the unloading bearing platform; according to the bridge span dismantling system, after the bridge span is unloaded to the ground or the specified height through the bridge span dismantling system, the bridge span is decomposed and dismantled, dust pollution is effectively reduced, and the bridge span dismantling system is more environmentally friendly.
本发明公开了一种用于单墩柱桥的桥跨拆除系统及拆除方法,包括卸落承重平台、卸落模块和导向模块,卸落承重平台设置于待拆除的单墩柱桥的桥跨的底面,用于承托待拆除的桥跨;卸落模块包括升降机构和承载板,升降机构设置于卸落承重平台的下方用于升举或卸落卸落承重平台,承载板安装于升降机构的底部;导向模块包括导向轨道和导向滑轮,导向轨道安装于待拆除的单墩柱桥的桥墩,导向滑轮以可沿导向滑轨滑动的方式安装于卸落承重平台,以形成对卸落承重平台的导向;本发明通过桥跨拆除系统将桥跨卸落至地面或指定高度后,再对其进行分解和拆除,有效减少粉尘污染,对环境更为友好。
Bridge span dismantling system and dismantling method for single-pier-stud bridge
用于单墩柱桥的桥跨拆除系统及拆除方法
YAO QIWEN (author) / CHENG SHI (author) / FENG HONGGANG (author) / RAN KANG (author) / LEI LINZI (author)
2023-12-26
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken