Light floor slab and preparation method thereof
The invention relates to the field of fabricated buildings, and discloses a light floor slab and a preparation method thereof.The light floor slab comprises a first inner frame and a second inner frame which are arranged side by side, supporting frameworks are laid in the first inner frame and the second inner frame respectively, and the supporting frameworks are matched with the first inner frame and the second inner frame to form a direct-connection floor slab in a pouring mode; the device further comprises a screw penetrating through the two mounting covers, the two ends of the screw are in threaded connection with nut sleeves respectively, the nut sleeves are located in the mounting covers, and the screw sequentially penetrates through the first mounting hole and the second mounting hole and is matched with the nut sleeves at the two ends of the screw to connect the adjacent side faces of the first inner frame and the second inner frame. As the first inner frame and the second inner frame are of frame structures, the overall weight is light, and carrying and transportation are convenient.
本发明涉及装配式建筑领域,公开了一种轻质楼板及其制备方法,包括两个位置并排设置的第一内框架和第二内框架,第一内框架和第二内框架内分别铺设有支撑骨架,支撑骨架分别与第一内框架和第二内框架相配合浇注形成直连楼板;还包括穿过两个安装罩的螺杆,螺杆的两端分别螺纹连接有螺母套,螺母套位于安装罩内,螺杆依次穿过第一安装孔和第二安装孔与其两端的螺母套配合将第一内框架和第二内框架的相邻侧面相连接。由于第一内框架和第二内框架为框架结构,因此,整体重量较轻,便于搬运和运输。
Light floor slab and preparation method thereof
The invention relates to the field of fabricated buildings, and discloses a light floor slab and a preparation method thereof.The light floor slab comprises a first inner frame and a second inner frame which are arranged side by side, supporting frameworks are laid in the first inner frame and the second inner frame respectively, and the supporting frameworks are matched with the first inner frame and the second inner frame to form a direct-connection floor slab in a pouring mode; the device further comprises a screw penetrating through the two mounting covers, the two ends of the screw are in threaded connection with nut sleeves respectively, the nut sleeves are located in the mounting covers, and the screw sequentially penetrates through the first mounting hole and the second mounting hole and is matched with the nut sleeves at the two ends of the screw to connect the adjacent side faces of the first inner frame and the second inner frame. As the first inner frame and the second inner frame are of frame structures, the overall weight is light, and carrying and transportation are convenient.
本发明涉及装配式建筑领域,公开了一种轻质楼板及其制备方法,包括两个位置并排设置的第一内框架和第二内框架,第一内框架和第二内框架内分别铺设有支撑骨架,支撑骨架分别与第一内框架和第二内框架相配合浇注形成直连楼板;还包括穿过两个安装罩的螺杆,螺杆的两端分别螺纹连接有螺母套,螺母套位于安装罩内,螺杆依次穿过第一安装孔和第二安装孔与其两端的螺母套配合将第一内框架和第二内框架的相邻侧面相连接。由于第一内框架和第二内框架为框架结构,因此,整体重量较轻,便于搬运和运输。
Light floor slab and preparation method thereof
一种轻质楼板及其制备方法
WU HANHUI (author) / XU SHENLIN (author) / WU SHIMIN (author) / LI XIAOMIN (author) / YU LONG (author)
2023-12-29
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
B23K
Löten
,
SOLDERING OR UNSOLDERING
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
Light interlayer prefabricated floor slab and preparation method thereof
European Patent Office | 2024
|Novel floor slab framework, floor slab and manufacturing method thereof
European Patent Office | 2021
|Prefabricated composite floor slab and preparation method thereof
European Patent Office | 2024
|Floor slab prefabricated part and preparation method thereof
European Patent Office | 2024
|