A platform for research: civil engineering, architecture and urbanism
Novel scaffold steel pipe binding structure
The invention relates to a novel scaffold steel pipe binding structure, and relates to the technical field of building construction. Comprising a scaffold vertical pipe, and two scaffold transverse pipes are arranged on the right side of the scaffold vertical pipe. When the device is used, a fixed rotary knob is rotated firstly, the fixed rotary knob rotates to enable two upper moving blocks and two lower moving blocks to move, and then two upper fastening plates and two lower fastening plates gradually get close to a scaffold transverse pipe; meanwhile, an upper moving block and a lower moving block move to enable two first threaded rods and two second threaded rods to rotate through a gear and a rack, so that two upper fastening plates and two lower fastening plates gradually get close to a scaffold transverse pipe, and then a scaffold vertical pipe and the scaffold transverse pipe are clamped by a first fastening groove and a second fastening groove at the same time correspondingly; and therefore, the scaffold vertical pipe is fixed, meanwhile, the scaffold transverse pipe is clamped and fixed, repeated fixing from different directions is avoided, the working intensity is reduced, and use is convenient.
本发明涉及一种新型脚手架钢管捆绑结构,涉及建筑施工技术领域。包括脚手架立管,所述脚手架立管的右方设置有两个脚手架横管。该发明,在使用时,首先转动固定旋钮,固定旋钮转动使得两个上移动块与两个下移动块移动,进而使得两个上紧固板和两个下紧固板逐渐靠近脚手架横管,同时上移动块与下移动块移动会通过齿轮和齿条使得两个第一螺纹杆和两个第二螺纹杆转动,使得两个上紧固板和两个下紧固板逐渐靠近脚手架横管,进而使得第一紧固槽和第二固定槽分别同时夹紧脚手架立管和脚手架横管,从而对脚手架立管固定的同时对脚手架横管进行夹紧固定,避免从不同方位进行重复进行固定,减少工作强度,便于使用。
Novel scaffold steel pipe binding structure
The invention relates to a novel scaffold steel pipe binding structure, and relates to the technical field of building construction. Comprising a scaffold vertical pipe, and two scaffold transverse pipes are arranged on the right side of the scaffold vertical pipe. When the device is used, a fixed rotary knob is rotated firstly, the fixed rotary knob rotates to enable two upper moving blocks and two lower moving blocks to move, and then two upper fastening plates and two lower fastening plates gradually get close to a scaffold transverse pipe; meanwhile, an upper moving block and a lower moving block move to enable two first threaded rods and two second threaded rods to rotate through a gear and a rack, so that two upper fastening plates and two lower fastening plates gradually get close to a scaffold transverse pipe, and then a scaffold vertical pipe and the scaffold transverse pipe are clamped by a first fastening groove and a second fastening groove at the same time correspondingly; and therefore, the scaffold vertical pipe is fixed, meanwhile, the scaffold transverse pipe is clamped and fixed, repeated fixing from different directions is avoided, the working intensity is reduced, and use is convenient.
本发明涉及一种新型脚手架钢管捆绑结构,涉及建筑施工技术领域。包括脚手架立管,所述脚手架立管的右方设置有两个脚手架横管。该发明,在使用时,首先转动固定旋钮,固定旋钮转动使得两个上移动块与两个下移动块移动,进而使得两个上紧固板和两个下紧固板逐渐靠近脚手架横管,同时上移动块与下移动块移动会通过齿轮和齿条使得两个第一螺纹杆和两个第二螺纹杆转动,使得两个上紧固板和两个下紧固板逐渐靠近脚手架横管,进而使得第一紧固槽和第二固定槽分别同时夹紧脚手架立管和脚手架横管,从而对脚手架立管固定的同时对脚手架横管进行夹紧固定,避免从不同方位进行重复进行固定,减少工作强度,便于使用。
Novel scaffold steel pipe binding structure
一种新型脚手架钢管捆绑结构
HUANG JINXIN (author) / CHENG ZHILIN (author) / XIAO WENJUN (author) / ZOU YONG (author) / CHEN YONGPENG (author) / ZHANG XINLIANG (author) / LIU KANG (author) / CHEN XIAOJIA (author) / ZHAO SIQI (author) / LI CHENLU (author)
2023-12-29
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste