A platform for research: civil engineering, architecture and urbanism
Cast-in-place supporting device for large-cantilever prestressed concrete cover beam
The invention discloses a large-cantilever prestressed concrete cover beam cast-in-place supporting device which comprises four bottom supporting columns, a base is arranged at the bottom end of each bottom supporting column in an attached mode, the bases are integrally in a T shape, the device can smoothly penetrate through the outside of an installed cover beam through the action of all expansion mechanisms, and therefore the supporting effect of the device is improved. According to the device, large-area disassembly of parts is avoided, so that the moving efficiency is improved, meanwhile, the labor intensity of operators is reduced, the overall stability can still be kept, the potential safety hazard of safety accidents of the operators can be reduced to a certain extent, and meanwhile, in the moving process, the overall structure of the device is in an A shape from the side view, so that the practicability is high. In this way, even if the road is bumpy, very high stability can still be kept, the toppling condition is avoided, and normal proceeding of moving work is guaranteed.
本发明公开了一种大悬臂预应力混凝土盖梁现浇支撑装置,包括底部支撑柱,底部支撑柱为四个,每个底部支撑柱的底端均贴合设置有底座,底座整体呈T型状,包括通过各个扩展机构的作用,使得装置能够顺利的从安装好的盖梁外穿过去,避免大面积的拆卸零部件,从而增加了移动效率,同时降低了操作工人的劳动强度,并且仍然能够保持整体的稳定性,能够在一定程度上降低劳动工人的安全事故隐患,同时在移动过程中,使得装置整体结构在侧面看去是呈A型状的,这样即使路途颠簸,仍然能够保持很强的稳定性,避免出现倾倒的情况出现,保证移动工作的正常进行。
Cast-in-place supporting device for large-cantilever prestressed concrete cover beam
The invention discloses a large-cantilever prestressed concrete cover beam cast-in-place supporting device which comprises four bottom supporting columns, a base is arranged at the bottom end of each bottom supporting column in an attached mode, the bases are integrally in a T shape, the device can smoothly penetrate through the outside of an installed cover beam through the action of all expansion mechanisms, and therefore the supporting effect of the device is improved. According to the device, large-area disassembly of parts is avoided, so that the moving efficiency is improved, meanwhile, the labor intensity of operators is reduced, the overall stability can still be kept, the potential safety hazard of safety accidents of the operators can be reduced to a certain extent, and meanwhile, in the moving process, the overall structure of the device is in an A shape from the side view, so that the practicability is high. In this way, even if the road is bumpy, very high stability can still be kept, the toppling condition is avoided, and normal proceeding of moving work is guaranteed.
本发明公开了一种大悬臂预应力混凝土盖梁现浇支撑装置,包括底部支撑柱,底部支撑柱为四个,每个底部支撑柱的底端均贴合设置有底座,底座整体呈T型状,包括通过各个扩展机构的作用,使得装置能够顺利的从安装好的盖梁外穿过去,避免大面积的拆卸零部件,从而增加了移动效率,同时降低了操作工人的劳动强度,并且仍然能够保持整体的稳定性,能够在一定程度上降低劳动工人的安全事故隐患,同时在移动过程中,使得装置整体结构在侧面看去是呈A型状的,这样即使路途颠簸,仍然能够保持很强的稳定性,避免出现倾倒的情况出现,保证移动工作的正常进行。
Cast-in-place supporting device for large-cantilever prestressed concrete cover beam
一种大悬臂预应力混凝土盖梁现浇支撑装置
JI TINGTING (author) / ZHANG CHAOKUI (author) / CAI YANG (author) / LIU GUOLI (author) / HUANG LIXIN (author) / ZHAO XUENAN (author)
2024-01-05
Patent
Electronic Resource
Chinese
Large-cantilever prestressed bent cap cast-in-place bracket
European Patent Office | 2020
|Large cantilever prestress cast-in-place concrete cover beam and construction method
European Patent Office | 2024
|European Patent Office | 2023
|Large-cantilever semi-fabricated prestressed concrete cover beam and construction process thereof
European Patent Office | 2022
|Taylor & Francis Verlag | 2024
|