Method for synchronous construction of gate groove installation and concrete pouring
The invention discloses a gate slot mounting and concrete pouring synchronous construction method which comprises the following steps: starting to construct a gate slot, firstly pouring a bottom plate, then mounting a sill, carrying out second-stage concrete pouring on the sill after the sill is mounted, and on the basis that the sill is poured, erecting a construction bent frame, when the mounting template pours the tower body to the height exceeding the length of the single section of the main reverse rail, the main reverse rail is hoisted in place, and the first-stage pouring joint bars are used for mounting and reinforcing the main reverse rail; and bolts on the two sides of a split screw fixing panel in the tower body formwork are loosened, the whole formwork is vertically moved to the next section of pouring position, and synchronous construction of gate groove installation and concrete pouring is achieved. According to the method for achieving synchronous construction of gate groove installation and concrete pouring, during construction, the construction bent frame only needs to be erected once, a formwork supporting system does not need to be erected, the linear construction period for installing concrete and metal structures of a water inlet tower is shortened, and the construction efficiency is improved.
本发明公开了一种门槽安装与混凝土浇筑同步施工的方法,包括以下步骤:门槽开始施工,先浇筑底板然后安装底坎,底坎安装完成后进行底坎二期砼浇筑,在底坎浇筑完成基础上,搭设施工排架,安装模板将塔体浇筑至超过主反轨单节长度的高度时,吊装主反轨到位,利用一期浇筑插筋安装加固主反轨;松动塔体模板中对拉螺杆固定面板两侧的螺栓,垂直移动模板整体至下一段浇筑位置,实现门槽安装与混凝土浇筑同步施工。本发明一种实现门槽安装与混凝土浇筑同步施工的方法在施工时只需搭设一次施工排架,无需搭设模板支撑体系,节约了进水塔混凝土及金属结构安装直线工期,提高了施工效率。
Method for synchronous construction of gate groove installation and concrete pouring
The invention discloses a gate slot mounting and concrete pouring synchronous construction method which comprises the following steps: starting to construct a gate slot, firstly pouring a bottom plate, then mounting a sill, carrying out second-stage concrete pouring on the sill after the sill is mounted, and on the basis that the sill is poured, erecting a construction bent frame, when the mounting template pours the tower body to the height exceeding the length of the single section of the main reverse rail, the main reverse rail is hoisted in place, and the first-stage pouring joint bars are used for mounting and reinforcing the main reverse rail; and bolts on the two sides of a split screw fixing panel in the tower body formwork are loosened, the whole formwork is vertically moved to the next section of pouring position, and synchronous construction of gate groove installation and concrete pouring is achieved. According to the method for achieving synchronous construction of gate groove installation and concrete pouring, during construction, the construction bent frame only needs to be erected once, a formwork supporting system does not need to be erected, the linear construction period for installing concrete and metal structures of a water inlet tower is shortened, and the construction efficiency is improved.
本发明公开了一种门槽安装与混凝土浇筑同步施工的方法,包括以下步骤:门槽开始施工,先浇筑底板然后安装底坎,底坎安装完成后进行底坎二期砼浇筑,在底坎浇筑完成基础上,搭设施工排架,安装模板将塔体浇筑至超过主反轨单节长度的高度时,吊装主反轨到位,利用一期浇筑插筋安装加固主反轨;松动塔体模板中对拉螺杆固定面板两侧的螺栓,垂直移动模板整体至下一段浇筑位置,实现门槽安装与混凝土浇筑同步施工。本发明一种实现门槽安装与混凝土浇筑同步施工的方法在施工时只需搭设一次施工排架,无需搭设模板支撑体系,节约了进水塔混凝土及金属结构安装直线工期,提高了施工效率。
Method for synchronous construction of gate groove installation and concrete pouring
一种门槽安装与混凝土浇筑同步施工的方法
WU RUIQING (author) / CHEN HAO (author) / CHEN YONG (author) / SHAN ZHUO (author) / LEI XINGGUO (author) / LEI HENG (author) / ZHANG YOUFEI (author) / YANG JIAJIA (author) / LI MENG (author) / CHEN ZHIYUAN (author)
2024-01-05
Patent
Electronic Resource
Chinese
Groove pouring type fabricated concrete shear wall and construction method
European Patent Office | 2021
|Pouring construction method of water tank foundation groove
European Patent Office | 2021
|Concrete pouring groove anti-overflow device and concrete pavement repairing method
European Patent Office | 2024
|