Construction structure and method for integrally pouring batter post and cross beam
The construction structure comprises a floor slab, the floor slab is provided with batter post steel bars used for improving the overall strength and stability of the batter post, the batter post steel bars are obliquely arranged, the batter post steel bars are sleeved with batter post mold bases, and first forming cavities are formed in the batter post mold bases; a first forming cavity is formed in the inclined column mold base, an inclined column mold sleeve is arranged on the inclined column mold base, a second forming cavity is formed in the inclined column mold sleeve, the inclined column steel bars are located in the first forming cavity and the second forming cavity, and the first forming cavity and the second forming cavity are used for pouring to form an inclined column shape; a cross beam formwork is arranged on the periphery of the cross beam steel bar, a third forming cavity used for pouring to form a cross beam shape is formed in the cross beam formwork, and the first forming cavity, the second forming cavity and the third forming cavity communicate with one another. The batter post and the cross beam are integrally poured, so that the construction efficiency is improved, and the concrete has the integral effect.
本申请涉及一种斜柱与横梁一体浇筑的施工结构及方法,包括楼板,所述楼板上设置有用于增加斜柱的整体强度和稳定性的斜柱钢筋,所述斜柱钢筋呈倾斜设置,所述斜柱钢筋上套设有斜柱模座,所述斜柱模座形成有第一成型腔,所述斜柱模座上设置有斜柱模套,所述斜柱模套形成有第二成型腔,所述斜柱钢筋位于第一成型腔以及第二成型腔内,所述第一成型腔以及第二成型腔用于浇筑形成斜柱形状,所述楼板上还设置有横梁钢筋,所述横梁钢筋外围设有横梁模板,所述横梁模板形成有用于浇筑形成横梁形状的第三成型腔,所述第一成型腔、第二成型腔以及第三成型腔均连通。本申请具有一种斜柱与横梁一体浇筑,有利于提升施工效率,使混凝土具有整体性的效果。
Construction structure and method for integrally pouring batter post and cross beam
The construction structure comprises a floor slab, the floor slab is provided with batter post steel bars used for improving the overall strength and stability of the batter post, the batter post steel bars are obliquely arranged, the batter post steel bars are sleeved with batter post mold bases, and first forming cavities are formed in the batter post mold bases; a first forming cavity is formed in the inclined column mold base, an inclined column mold sleeve is arranged on the inclined column mold base, a second forming cavity is formed in the inclined column mold sleeve, the inclined column steel bars are located in the first forming cavity and the second forming cavity, and the first forming cavity and the second forming cavity are used for pouring to form an inclined column shape; a cross beam formwork is arranged on the periphery of the cross beam steel bar, a third forming cavity used for pouring to form a cross beam shape is formed in the cross beam formwork, and the first forming cavity, the second forming cavity and the third forming cavity communicate with one another. The batter post and the cross beam are integrally poured, so that the construction efficiency is improved, and the concrete has the integral effect.
本申请涉及一种斜柱与横梁一体浇筑的施工结构及方法,包括楼板,所述楼板上设置有用于增加斜柱的整体强度和稳定性的斜柱钢筋,所述斜柱钢筋呈倾斜设置,所述斜柱钢筋上套设有斜柱模座,所述斜柱模座形成有第一成型腔,所述斜柱模座上设置有斜柱模套,所述斜柱模套形成有第二成型腔,所述斜柱钢筋位于第一成型腔以及第二成型腔内,所述第一成型腔以及第二成型腔用于浇筑形成斜柱形状,所述楼板上还设置有横梁钢筋,所述横梁钢筋外围设有横梁模板,所述横梁模板形成有用于浇筑形成横梁形状的第三成型腔,所述第一成型腔、第二成型腔以及第三成型腔均连通。本申请具有一种斜柱与横梁一体浇筑,有利于提升施工效率,使混凝土具有整体性的效果。
Construction structure and method for integrally pouring batter post and cross beam
一种斜柱与横梁一体浇筑的施工结构及方法
ZENG DONGCAI (author) / PAN MINGJIAN (author) / YAO CHONGWU (author) / LIN CHUANWU (author)
2024-01-09
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Feeding equipment for profile steel batter post concrete pouring
European Patent Office | 2022
|Construction method for integrally pouring concrete into inspection well
European Patent Office | 2021
|European Patent Office | 2024
|Construction method for integrally forming building house through secondary pouring
European Patent Office | 2023
|