A platform for research: civil engineering, architecture and urbanism
Splicing operation platform for vase pier construction
The invention provides a vase pier construction and assembly operation platform. The vase pier construction and assembly operation platform comprises a supporting frame built by adopting transverse rods and vertical rods to surround a vase pier base. A walking tray is erected on the top of the supporting frame, climbing frames are arranged on the outer sides of the vertical rods in a left-right staggered mode, protective frames are detachably and fixedly assembled on the outer sides of the climbing frames, breast boards are arranged between the upper transverse rod and the lower transverse rod located on the outer sides of the supporting frames, and adjustable supporting feet are arranged at the bottoms of the vertical rods at the bottoms of the supporting frames. According to the vase pier construction splicing operation platform, the vase pier construction splicing operation platform is formed by splicing the transverse rods, the vertical rods, the adjustable supporting legs, the breast boards, the protection frames, the walking trays and other assemblies, repeated use can be achieved, the use cost is reduced, use is convenient, and potential safety hazards are reduced.
本发明提供一种花瓶墩施工拼装操作平台,包括采用横杆与立杆环绕花瓶墩底座搭建的支撑架;所述支撑架的顶部搭设有行走托盘,所述立杆的外侧左右交错设置有攀爬架,所述攀爬架外侧可拆卸固定装配有防护架,位于所述支撑架外侧的上下两个所述横杆之间设置有栏板,所述支撑架底部的所述立杆的底部设置有可调支脚。本发明中,花瓶墩施工拼装操作平台采用横杆、立杆、可调支脚、栏板、防护架、行走托盘等组件拼接而成,能够重复使用,降低使用成本,方便使用,降低安全隐患。
Splicing operation platform for vase pier construction
The invention provides a vase pier construction and assembly operation platform. The vase pier construction and assembly operation platform comprises a supporting frame built by adopting transverse rods and vertical rods to surround a vase pier base. A walking tray is erected on the top of the supporting frame, climbing frames are arranged on the outer sides of the vertical rods in a left-right staggered mode, protective frames are detachably and fixedly assembled on the outer sides of the climbing frames, breast boards are arranged between the upper transverse rod and the lower transverse rod located on the outer sides of the supporting frames, and adjustable supporting feet are arranged at the bottoms of the vertical rods at the bottoms of the supporting frames. According to the vase pier construction splicing operation platform, the vase pier construction splicing operation platform is formed by splicing the transverse rods, the vertical rods, the adjustable supporting legs, the breast boards, the protection frames, the walking trays and other assemblies, repeated use can be achieved, the use cost is reduced, use is convenient, and potential safety hazards are reduced.
本发明提供一种花瓶墩施工拼装操作平台,包括采用横杆与立杆环绕花瓶墩底座搭建的支撑架;所述支撑架的顶部搭设有行走托盘,所述立杆的外侧左右交错设置有攀爬架,所述攀爬架外侧可拆卸固定装配有防护架,位于所述支撑架外侧的上下两个所述横杆之间设置有栏板,所述支撑架底部的所述立杆的底部设置有可调支脚。本发明中,花瓶墩施工拼装操作平台采用横杆、立杆、可调支脚、栏板、防护架、行走托盘等组件拼接而成,能够重复使用,降低使用成本,方便使用,降低安全隐患。
Splicing operation platform for vase pier construction
一种花瓶墩施工拼装操作平台
ZHOU YONG (author) / ZHANG XUELAI (author) / SUN QI (author) / MA YANAN (author) / WANG YONG (author) / XIE CHUNLEI (author) / PENG YI (author)
2024-01-12
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Bridge vase pier steel formwork fixing construction method
European Patent Office | 2024
|