The invention belongs to the technical field of buildings, particularly relates to a waterproof construction process and construction equipment for a basement roof, and aims to overcome the defects that in the prior art, waterproof coiled materials cannot be softened, and the waterproof coiled materials are prone to being scratched in the pressing process, the construction process comprises the steps that S1, the roof needing to be laid with the waterproof coiled materials is cleaned; s2, brushing the cleaned top plate with a base layer treating agent; s3, detail nodes on the top plate are processed; and S4, rubber asphalt waterproof paint is scraped, the whole device can be driven to move when a driving motor is started, waterproof coiled materials can be automatically laid in different areas of the basement roof in an all-dimensional mode, and when the waterproof coiled materials are laid, the waterproof coiled materials can be heated in advance; the waterproof roll can be pressed stably, so that the waterproof roll can be tightly attached to the top plate, meanwhile, the waterproof roll can be stably pressed, the waterproof roll can be stably bonded, and the problem that the waterproof roll is scraped is avoided.
本发明属于建筑技术领域,尤其是地下室顶板防水施工工艺及施工设备,针对现有技术中不能对防水卷材进行软化以及在对防水卷材进行压实时,容易被刮裂的缺点,其施工工艺包括S1、将需要铺设防水卷材的顶板进行清扫;S2、将基层处理剂涂刷在清扫后的顶板上;S3、对顶板上的细部节点进行处理;S4、刮涂橡胶沥青防水涂料,本发明在启动驱动电机能够带动整体装置进行运动,以便能够对地下室顶板的不同区域进行全方位自动铺设防水卷材,并且在对防水卷材进行铺设时,能够对防水卷材预先进行加热,以保证防水卷材与顶板紧密的贴合,同时能够对防水卷材进行稳定压制,使得防水卷材能够稳定的被粘接,避免防水卷材发生刮破的问题。
Waterproof construction process and construction equipment for basement roof
The invention belongs to the technical field of buildings, particularly relates to a waterproof construction process and construction equipment for a basement roof, and aims to overcome the defects that in the prior art, waterproof coiled materials cannot be softened, and the waterproof coiled materials are prone to being scratched in the pressing process, the construction process comprises the steps that S1, the roof needing to be laid with the waterproof coiled materials is cleaned; s2, brushing the cleaned top plate with a base layer treating agent; s3, detail nodes on the top plate are processed; and S4, rubber asphalt waterproof paint is scraped, the whole device can be driven to move when a driving motor is started, waterproof coiled materials can be automatically laid in different areas of the basement roof in an all-dimensional mode, and when the waterproof coiled materials are laid, the waterproof coiled materials can be heated in advance; the waterproof roll can be pressed stably, so that the waterproof roll can be tightly attached to the top plate, meanwhile, the waterproof roll can be stably pressed, the waterproof roll can be stably bonded, and the problem that the waterproof roll is scraped is avoided.
本发明属于建筑技术领域,尤其是地下室顶板防水施工工艺及施工设备,针对现有技术中不能对防水卷材进行软化以及在对防水卷材进行压实时,容易被刮裂的缺点,其施工工艺包括S1、将需要铺设防水卷材的顶板进行清扫;S2、将基层处理剂涂刷在清扫后的顶板上;S3、对顶板上的细部节点进行处理;S4、刮涂橡胶沥青防水涂料,本发明在启动驱动电机能够带动整体装置进行运动,以便能够对地下室顶板的不同区域进行全方位自动铺设防水卷材,并且在对防水卷材进行铺设时,能够对防水卷材预先进行加热,以保证防水卷材与顶板紧密的贴合,同时能够对防水卷材进行稳定压制,使得防水卷材能够稳定的被粘接,避免防水卷材发生刮破的问题。
Waterproof construction process and construction equipment for basement roof
一种地下室顶板防水施工工艺及施工设备
WANG HAIFENG (author) / CHEN MAOJUN (author) / HE LIXUN (author)
2024-01-12
Patent
Electronic Resource
Chinese
Waterproof construction method for roof, basement exterior wall and basement roof
European Patent Office | 2021
|