A platform for research: civil engineering, architecture and urbanism
Implementation method of fabricated halfpace concrete step
The invention relates to the technical field of assembly of stair steps, in particular to an implementation method of an assembly type halfpace concrete step, which comprises the following steps of: prefabricating an assembly type step prefabricated part, assembling a bottom template of a stair plate or a foundation platform step plate, arranging reinforcing steel bars on the bottom template, hanging or binding a hook of the assembly type step prefabricated part on the reinforcing steel bars, and fixing the assembly type step prefabricated part on the foundation platform step plate. And concrete is poured from top to bottom in the length direction of the stair plate or the foundation platform step plate, so that the concrete is combined with the slopes of the multiple assembly type step prefabricated parts into a whole after being solidified. According to the invention, the use of concrete can be reduced, the static pressure load of the step can be reduced, the undesirable phenomena of fracture, deformation displacement and the like of the step which influence the beauty can be avoided, and when concrete step and stair concrete step are built, tedious working procedures such as mounting and dismounting of a step end face blocking mold and a step lower blocking mold are not needed; the fabricated step prefabricated part can be quickly produced in batches in a factory-like manner, is relatively light in texture, and is labor-saving, time-saving, energy-saving and environment-friendly.
本发明涉及楼梯踏步的装配技术领域,具体地说是一种装配式梯台砼踏步的实施方法,该实施方法包括预制装配式踏步预制件,装配楼梯板或基础台阶梯板的底模板,在底模板上布置钢筋,将装配式踏步预制件的挂钩挂于或绑扎在钢筋上,沿楼梯板或基础台阶梯板的长度方向自上而下浇灌混凝土,使混凝土凝固后与多个装配式踏步预制件的斜面结合为一整体。本发明能够减少混凝土的使用,减小台阶踏步静压载荷,杜绝台阶产生断裂、形变位移等影响美观的不良现象,筑建砼台阶踏步、楼梯砼踏步时,无需装卸踏步端面挡模和踏步下挡模等繁琐工序工步,装配式踏步预制件可工厂化快速批量生产各种所需规格,质地相对轻巧、省工省时、节能环保。
Implementation method of fabricated halfpace concrete step
The invention relates to the technical field of assembly of stair steps, in particular to an implementation method of an assembly type halfpace concrete step, which comprises the following steps of: prefabricating an assembly type step prefabricated part, assembling a bottom template of a stair plate or a foundation platform step plate, arranging reinforcing steel bars on the bottom template, hanging or binding a hook of the assembly type step prefabricated part on the reinforcing steel bars, and fixing the assembly type step prefabricated part on the foundation platform step plate. And concrete is poured from top to bottom in the length direction of the stair plate or the foundation platform step plate, so that the concrete is combined with the slopes of the multiple assembly type step prefabricated parts into a whole after being solidified. According to the invention, the use of concrete can be reduced, the static pressure load of the step can be reduced, the undesirable phenomena of fracture, deformation displacement and the like of the step which influence the beauty can be avoided, and when concrete step and stair concrete step are built, tedious working procedures such as mounting and dismounting of a step end face blocking mold and a step lower blocking mold are not needed; the fabricated step prefabricated part can be quickly produced in batches in a factory-like manner, is relatively light in texture, and is labor-saving, time-saving, energy-saving and environment-friendly.
本发明涉及楼梯踏步的装配技术领域,具体地说是一种装配式梯台砼踏步的实施方法,该实施方法包括预制装配式踏步预制件,装配楼梯板或基础台阶梯板的底模板,在底模板上布置钢筋,将装配式踏步预制件的挂钩挂于或绑扎在钢筋上,沿楼梯板或基础台阶梯板的长度方向自上而下浇灌混凝土,使混凝土凝固后与多个装配式踏步预制件的斜面结合为一整体。本发明能够减少混凝土的使用,减小台阶踏步静压载荷,杜绝台阶产生断裂、形变位移等影响美观的不良现象,筑建砼台阶踏步、楼梯砼踏步时,无需装卸踏步端面挡模和踏步下挡模等繁琐工序工步,装配式踏步预制件可工厂化快速批量生产各种所需规格,质地相对轻巧、省工省时、节能环保。
Implementation method of fabricated halfpace concrete step
一种装配式梯台砼踏步的实施方法
ZHANG SHUN (author) / ZHOU YAO (author) / ZHANG TIEMEI (author) / WANG FAN (author) / ZHANG YONG (author) / ZOU QIAOXIA (author) / XIANG ANSHUN (author) / QING QIONG (author) / LIU QILING (author) / ZOU ZEBO (author)
2024-01-12
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
European Patent Office | 2024
|European Patent Office | 2023
|Construction method of fabricated steel-concrete structure step stand
European Patent Office | 2022
|Fabricated concrete step honeycomb-shaped coast anti-erosion structure
European Patent Office | 2021
|