According to the technical scheme, the intelligent construction assembly type steel beam column rigid connection joint is characterized in that the intelligent construction assembly type steel beam column rigid connection joint comprises a first square pipe, a second square pipe is arranged on the top face of the first square pipe, and a plurality of fixing holes are formed in the outer wall of the first square pipe and the outer wall of the second square pipe; the fixing assembly is arranged on one side of the first square pipe and comprises first connecting plates, the first connecting plates are arranged on the front side and the rear side of the first square pipe and the front side and the rear side of the second square pipe, a plurality of first threaded holes are formed in one side of each first connecting plate, and first bolts are movably installed in the first threaded holes; the first bolt penetrates through the first threaded hole and extends into the fixing hole, the first bolt penetrates through the first threaded hole by rotating the first bolt, so that the first connecting plate is fixedly mounted on one side of the first square pipe and one side of the second square pipe, and the second bolt enters the fixing hole by rotating the second bolt, so that the mounting part is fixed; on-site welding and hoisting time is reduced, cost is saved, the safety coefficient is improved, and installation is convenient.
本发明公开了智能建造装配式钢梁柱刚接节点,其技术方案要点是:包括第一方管,第一方管的顶面设置有第二方管,第一方管与第二方管的外壁开设有若干个固定孔;固定组件,固定组件设置在第一方管的一侧,固定组件包括第一连接板,第一连接板设置在第一方管与第二方管的前后两侧位置,第一连接板的一侧开设有若干个第一螺纹孔,第一螺纹孔的内部活动安装有第一螺栓,第一螺栓穿过第一螺纹孔延伸至固定孔的内部,通过转动第一螺栓,使第一螺栓穿过第一螺纹孔,使第一连接板固定安装在第一方管与第二方管的一侧,通过转动第二螺栓,使第二螺栓进入固定孔的内部,对安装部位进行固定,减少现场焊接和吊装时间,节约成本,提高安全系数,安装方便。
According to the technical scheme, the intelligent construction assembly type steel beam column rigid connection joint is characterized in that the intelligent construction assembly type steel beam column rigid connection joint comprises a first square pipe, a second square pipe is arranged on the top face of the first square pipe, and a plurality of fixing holes are formed in the outer wall of the first square pipe and the outer wall of the second square pipe; the fixing assembly is arranged on one side of the first square pipe and comprises first connecting plates, the first connecting plates are arranged on the front side and the rear side of the first square pipe and the front side and the rear side of the second square pipe, a plurality of first threaded holes are formed in one side of each first connecting plate, and first bolts are movably installed in the first threaded holes; the first bolt penetrates through the first threaded hole and extends into the fixing hole, the first bolt penetrates through the first threaded hole by rotating the first bolt, so that the first connecting plate is fixedly mounted on one side of the first square pipe and one side of the second square pipe, and the second bolt enters the fixing hole by rotating the second bolt, so that the mounting part is fixed; on-site welding and hoisting time is reduced, cost is saved, the safety coefficient is improved, and installation is convenient.
本发明公开了智能建造装配式钢梁柱刚接节点,其技术方案要点是:包括第一方管,第一方管的顶面设置有第二方管,第一方管与第二方管的外壁开设有若干个固定孔;固定组件,固定组件设置在第一方管的一侧,固定组件包括第一连接板,第一连接板设置在第一方管与第二方管的前后两侧位置,第一连接板的一侧开设有若干个第一螺纹孔,第一螺纹孔的内部活动安装有第一螺栓,第一螺栓穿过第一螺纹孔延伸至固定孔的内部,通过转动第一螺栓,使第一螺栓穿过第一螺纹孔,使第一连接板固定安装在第一方管与第二方管的一侧,通过转动第二螺栓,使第二螺栓进入固定孔的内部,对安装部位进行固定,减少现场焊接和吊装时间,节约成本,提高安全系数,安装方便。
Intelligent construction assembly type steel beam column rigid connection joint
智能建造装配式钢梁柱刚接节点
YI LING (author)
2024-01-30
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2024
|Beam column rigid connection joint and construction method
European Patent Office | 2022
|Rigid connection joint of concrete beam conversion steel column
European Patent Office | 2021
|European Patent Office | 2021
|