A platform for research: civil engineering, architecture and urbanism
Concrete modular building and construction method
The invention provides a concrete modular building and a construction method, and relates to the technical field of modular constructions.The concrete modular building comprises five-face box bodies and six-face box bodies, the bottoms of the five-face box bodies are open, and the five-face box bodies and the six-face box bodies are equal in size and are each provided with a plurality of box bodies; the six-face box bodies are spliced to the bottommost layer of the modular building, the five-face box bodies are sequentially arranged in the longitudinal direction and the transverse direction and located above the six-face box bodies, the four corners of the top of each six-face box body and the four corners of the top and the four corners of the bottom of each five-face box body are each provided with a pair of installation grooves, and square steel columns are fixed into the installation grooves. The concrete modular building has the beneficial effects that the problems that the labor cost and the material cost are greatly increased due to the fact that the modular building is long in manufacturing period and heavy in overall weight, and connecting pieces adopted in the concrete modular building are generally in one-way connection and are poor in universality, and gaps are reserved after connection are solved.
本发明提供了一种混凝土模块化建筑及工法,本发明涉及模块化建筑技术领域,其中,混凝土模块化建筑,包括:五面箱体和六面箱体,五面箱体底部呈敞开状,五面箱体和六面箱体体积大小相等且均设有若干,若干个六面箱体拼接于模块化建筑最底层,若干个五面箱体纵横依次排布且均位于若干个六面箱体上方,六面箱体顶部四角处和五面箱体顶、底部四角处均开有一对安装槽,安装槽内均固定有方形钢柱;本发明的有益效果在于:解决了模块化建筑制作工期长、整体较重,从而大大增加了人力成本和物料成本以及混凝土模块化建筑中所采用的连接件通常为单向连接,通用性差,且连接后还会留有空隙的问题。
Concrete modular building and construction method
The invention provides a concrete modular building and a construction method, and relates to the technical field of modular constructions.The concrete modular building comprises five-face box bodies and six-face box bodies, the bottoms of the five-face box bodies are open, and the five-face box bodies and the six-face box bodies are equal in size and are each provided with a plurality of box bodies; the six-face box bodies are spliced to the bottommost layer of the modular building, the five-face box bodies are sequentially arranged in the longitudinal direction and the transverse direction and located above the six-face box bodies, the four corners of the top of each six-face box body and the four corners of the top and the four corners of the bottom of each five-face box body are each provided with a pair of installation grooves, and square steel columns are fixed into the installation grooves. The concrete modular building has the beneficial effects that the problems that the labor cost and the material cost are greatly increased due to the fact that the modular building is long in manufacturing period and heavy in overall weight, and connecting pieces adopted in the concrete modular building are generally in one-way connection and are poor in universality, and gaps are reserved after connection are solved.
本发明提供了一种混凝土模块化建筑及工法,本发明涉及模块化建筑技术领域,其中,混凝土模块化建筑,包括:五面箱体和六面箱体,五面箱体底部呈敞开状,五面箱体和六面箱体体积大小相等且均设有若干,若干个六面箱体拼接于模块化建筑最底层,若干个五面箱体纵横依次排布且均位于若干个六面箱体上方,六面箱体顶部四角处和五面箱体顶、底部四角处均开有一对安装槽,安装槽内均固定有方形钢柱;本发明的有益效果在于:解决了模块化建筑制作工期长、整体较重,从而大大增加了人力成本和物料成本以及混凝土模块化建筑中所采用的连接件通常为单向连接,通用性差,且连接后还会留有空隙的问题。
Concrete modular building and construction method
一种混凝土模块化建筑及工法
YANG JINGWEI (author) / YAO DAWEI (author) / JIANG LONG (author) / HOU JUN (author) / BAI JIULIN (author) / CHENG YAPENG (author)
2024-01-30
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Concrete box type building module, modular building and construction method of modular building
European Patent Office | 2022
|Construction method of building structure and concrete modular building structure
European Patent Office | 2024
|Concrete module, modular building, manufacturing method and construction method
European Patent Office | 2023
|European Patent Office | 2023
|