Prestressed high-strength concrete pipe pile guide hole pile planting construction method
The invention discloses a guide hole pile planting construction method for a prestressed high-strength concrete pipe pile. The guide hole pile planting construction method comprises the following steps that S01, a site is leveled; s02, pile position lofting is carried out; s03, a drilling machine aligns hole positions; s04, drilling holes by a drilling machine; s05, hole cleaning is carried out; s06, mortar is poured for bottom sealing; s07, the pile is hoisted by a pile machine; s08, pile planting is conducted through a pile machine; s09, pile splicing is conducted; s10, the pile is conveyed; and S11, filling and covering the pile hole. The method has the beneficial effects that the hole guiding pile planting mode is simple and efficient, and compared with a direct hammering pile sinking construction method without hole guiding, the construction noise is low, vibration is light, pollution is small, and the influence on the surrounding environment can be reduced; the construction speed and the work efficiency are high; the construction period is short; and the construction cost is low.
本发明公开了一种预应力高强度混凝土管桩引孔植桩施工方法,包括如下步骤:S01,平整场地;S02,桩位放样;S03,钻机对孔位;S04,钻机引孔;S05,清孔;S06,灌注砂浆封底;S07,桩机吊桩;S08,桩机植桩;S09,接桩;S10,送桩;S11,填盖桩孔。本发明的有益效果:引孔植桩方式简单、高效,相比不引孔的直接锤击沉桩施工方法,施工噪声低、振动轻、污染小,有利于减少对周围环境的影响;施工速度快,工效高,工期短,施工成本低。
Prestressed high-strength concrete pipe pile guide hole pile planting construction method
The invention discloses a guide hole pile planting construction method for a prestressed high-strength concrete pipe pile. The guide hole pile planting construction method comprises the following steps that S01, a site is leveled; s02, pile position lofting is carried out; s03, a drilling machine aligns hole positions; s04, drilling holes by a drilling machine; s05, hole cleaning is carried out; s06, mortar is poured for bottom sealing; s07, the pile is hoisted by a pile machine; s08, pile planting is conducted through a pile machine; s09, pile splicing is conducted; s10, the pile is conveyed; and S11, filling and covering the pile hole. The method has the beneficial effects that the hole guiding pile planting mode is simple and efficient, and compared with a direct hammering pile sinking construction method without hole guiding, the construction noise is low, vibration is light, pollution is small, and the influence on the surrounding environment can be reduced; the construction speed and the work efficiency are high; the construction period is short; and the construction cost is low.
本发明公开了一种预应力高强度混凝土管桩引孔植桩施工方法,包括如下步骤:S01,平整场地;S02,桩位放样;S03,钻机对孔位;S04,钻机引孔;S05,清孔;S06,灌注砂浆封底;S07,桩机吊桩;S08,桩机植桩;S09,接桩;S10,送桩;S11,填盖桩孔。本发明的有益效果:引孔植桩方式简单、高效,相比不引孔的直接锤击沉桩施工方法,施工噪声低、振动轻、污染小,有利于减少对周围环境的影响;施工速度快,工效高,工期短,施工成本低。
Prestressed high-strength concrete pipe pile guide hole pile planting construction method
一种预应力高强度混凝土管桩引孔植桩施工方法
CHEN CHANGJUN (author) / ZHANG XIAOLIANG (author) / WANG YIHAO (author) / CHEN JIANJUN (author) / SI ZHENWEI (author) / XIE JINHONG (author) / YANG YI (author) / XIE DONG (author)
2024-02-02
Patent
Electronic Resource
Chinese
Pile planting construction method for prestressed pipe pile
European Patent Office | 2023
|European Patent Office | 2023
|European Patent Office | 2023
|Prestressed high-strength concrete pipe pile steel pile shoe
European Patent Office | 2023
|