Construction method for comprehensive pipe gallery through pipe-roofing method
The invention provides a pipe roofing method comprehensive pipe gallery construction method which comprises the following steps: a reinforcing step: arranging a special-shaped end on one side of a receiving well and reinforcing a soil body in a special-shaped end area; a pipe curtain construction step: constructing a pipe curtain from the starting well to the receiving well of the pipe gallery; and in the cavern construction step, the pipe gallery is divided into three caverns, the caverns on the two sides are constructed firstly, then the caverns in the middle are constructed, and each cavern is constructed in a penetrating mode from the starting well to the receiving well. According to the construction method, the special-shaped end is arranged on one side of the receiving well, the soil body of the special-shaped end area is reinforced, then the pipe curtain is constructed from the starting well of the pipe gallery to the receiving well, the three cavities divided by the pipe gallery are constructed respectively, and each cavity is constructed from the starting well to the receiving well in a penetrating mode, so that construction of the comprehensive pipe gallery can be guaranteed, and the construction efficiency of the comprehensive pipe gallery is improved. Even if the special-shaped end is not perpendicular to the pipe gallery channel, construction of the special-shaped end area can be guaranteed, the construction quality of the comprehensive pipe gallery is effectively improved, operation is easy, and implementation is convenient.
本发明提供了一种管幕法综合管廊施工方法,该方法包括:加固步骤,将异型端头布置于接收井的一侧并对异型端头区域的土体进行加固;管幕施工步骤,从管廊的始发井至接收井施工管幕;洞室施工步骤,将管廊划分为三个洞室,先对两侧洞室进行施工,再对中间洞室进行施工,每个洞室均从始发井处至接收井处贯通施工。本发明中,将异型端头布置于接收井的一侧,并对异型端头区域的土体加固,然后从管廊的始发井至接收井施工管幕,对管廊划分的三个洞室分别施工,每个洞室均从始发井处至接收井处贯通施工,这样能够保证综合管廊的施工,即使异型端头与管廊通道不垂直,也能保证异型端头区域的施工,有效提高了综合管廊的施工质量,操作简单,便于实施。
Construction method for comprehensive pipe gallery through pipe-roofing method
The invention provides a pipe roofing method comprehensive pipe gallery construction method which comprises the following steps: a reinforcing step: arranging a special-shaped end on one side of a receiving well and reinforcing a soil body in a special-shaped end area; a pipe curtain construction step: constructing a pipe curtain from the starting well to the receiving well of the pipe gallery; and in the cavern construction step, the pipe gallery is divided into three caverns, the caverns on the two sides are constructed firstly, then the caverns in the middle are constructed, and each cavern is constructed in a penetrating mode from the starting well to the receiving well. According to the construction method, the special-shaped end is arranged on one side of the receiving well, the soil body of the special-shaped end area is reinforced, then the pipe curtain is constructed from the starting well of the pipe gallery to the receiving well, the three cavities divided by the pipe gallery are constructed respectively, and each cavity is constructed from the starting well to the receiving well in a penetrating mode, so that construction of the comprehensive pipe gallery can be guaranteed, and the construction efficiency of the comprehensive pipe gallery is improved. Even if the special-shaped end is not perpendicular to the pipe gallery channel, construction of the special-shaped end area can be guaranteed, the construction quality of the comprehensive pipe gallery is effectively improved, operation is easy, and implementation is convenient.
本发明提供了一种管幕法综合管廊施工方法,该方法包括:加固步骤,将异型端头布置于接收井的一侧并对异型端头区域的土体进行加固;管幕施工步骤,从管廊的始发井至接收井施工管幕;洞室施工步骤,将管廊划分为三个洞室,先对两侧洞室进行施工,再对中间洞室进行施工,每个洞室均从始发井处至接收井处贯通施工。本发明中,将异型端头布置于接收井的一侧,并对异型端头区域的土体加固,然后从管廊的始发井至接收井施工管幕,对管廊划分的三个洞室分别施工,每个洞室均从始发井处至接收井处贯通施工,这样能够保证综合管廊的施工,即使异型端头与管廊通道不垂直,也能保证异型端头区域的施工,有效提高了综合管廊的施工质量,操作简单,便于实施。
Construction method for comprehensive pipe gallery through pipe-roofing method
管幕法综合管廊施工方法
ZENG JIAXIN (author) / WANG YOUTAO (author) / LI YI (author) / ZHENG XINGYANG (author) / LIN JIANWEN (author)
2024-02-02
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Foldable comprehensive pipe gallery pipe joint, comprehensive pipe gallery and construction method
European Patent Office | 2020
|Construction method of comprehensive pipe gallery and long-section pipe gallery
European Patent Office | 2022
|European Patent Office | 2021
|