A platform for research: civil engineering, architecture and urbanism
Steel structure house concrete floor slab for winter construction and construction method
The invention relates to the technical field of winter building construction, in particular to a steel structure house concrete floor for winter construction and a construction method.Pre-buried angle steel is arranged at the bottom corner positions of the two sides of the concrete floor in the length direction, fixing is conducted through the pre-buried angle steel and a steel beam, during construction, studs are not needed, the construction speed is high, and wet operation does not exist in the early stage; after laying on a construction site is completed, an operation face can be provided for other construction operations, the follow-up construction progress is not affected, the influence of low temperature in winter on construction is greatly reduced, after temperature rotation, pouring is conducted on a post-grouting area between the concrete floor slabs, the construction quality is guaranteed, and the prefabricated concrete floor slabs are high in strength, large in rigidity and easy to manufacture.
本发明涉及冬季建筑施工技术领域,具体是一种用于冬季施工的钢结构房屋混凝土楼板及施工方法,混凝土楼板长度方向的两侧底角位置设置预埋角钢,通过预埋角钢与钢梁进行固定,施工时免栓钉、施工速度快,前期无湿作业,施工现场铺设完成后即可为其他施工作业提供操作面,不影响后续的施工进度,大大降低了冬季低温给施工带来的影响,待待温度回转后,对混凝土楼板之间的后灌浆区进行浇筑,保障施工质量,且预制的混凝土楼板强度高、刚度大、制作简单。
Steel structure house concrete floor slab for winter construction and construction method
The invention relates to the technical field of winter building construction, in particular to a steel structure house concrete floor for winter construction and a construction method.Pre-buried angle steel is arranged at the bottom corner positions of the two sides of the concrete floor in the length direction, fixing is conducted through the pre-buried angle steel and a steel beam, during construction, studs are not needed, the construction speed is high, and wet operation does not exist in the early stage; after laying on a construction site is completed, an operation face can be provided for other construction operations, the follow-up construction progress is not affected, the influence of low temperature in winter on construction is greatly reduced, after temperature rotation, pouring is conducted on a post-grouting area between the concrete floor slabs, the construction quality is guaranteed, and the prefabricated concrete floor slabs are high in strength, large in rigidity and easy to manufacture.
本发明涉及冬季建筑施工技术领域,具体是一种用于冬季施工的钢结构房屋混凝土楼板及施工方法,混凝土楼板长度方向的两侧底角位置设置预埋角钢,通过预埋角钢与钢梁进行固定,施工时免栓钉、施工速度快,前期无湿作业,施工现场铺设完成后即可为其他施工作业提供操作面,不影响后续的施工进度,大大降低了冬季低温给施工带来的影响,待待温度回转后,对混凝土楼板之间的后灌浆区进行浇筑,保障施工质量,且预制的混凝土楼板强度高、刚度大、制作简单。
Steel structure house concrete floor slab for winter construction and construction method
一种用于冬季施工的钢结构房屋混凝土楼板及施工方法
HU CHUNYU (author) / ZHANG LILIN (author) / CHEN WENZHI (author) / YU ZHENGXING (author)
2024-02-06
Patent
Electronic Resource
Chinese
Construction method and construction device of concrete floor slab and concrete floor slab
European Patent Office | 2023
|CONCRETE FLOOR SLAB REMOVAL METHOD AND CONCRETE FLOOR SLAB CONSTRUCTION METHOD
European Patent Office | 2018
|LIGHTWEIGHT CONCRETE FLOOR SLAB AND LIGHTWEIGHT CONCRETE FLOOR SLAB CONSTRUCTION METHOD
European Patent Office | 2023
|