A platform for research: civil engineering, architecture and urbanism
Fabricated pool wallboard assembly and construction method
The fabricated pool wallboard assembly comprises an upper positioning force transmission frame and a lower positioning force transmission frame which are connected in a matched mode, a steel bar frame is installed on the upper portion of the upper positioning force transmission frame, and concrete is poured between the upper positioning force transmission frame and the lower positioning force transmission frame and in the steel bar frame; an upper positioning force transmission frame is composed of positioning force transmission plates and upper connecting plates, the positioning force transmission plates are arranged in parallel, and the two sides of the positioning force transmission plates are connected through the upper connecting plates. Construction is convenient and fast, the connecting strength of joints at the connecting position can be effectively guaranteed, the construction period is greatly shortened, the use amount of formworks is reduced, and therefore the purpose of saving the manufacturing cost is achieved.
本发明涉及一种装配式水池壁板组件及施工方法,包括相互配合连接的上定位传力框架和下定位传力框架,上定位传力框架上部安装钢筋架,上定位传力框架和下定位传力框架之间以及钢筋架中灌注混凝土;本发明上定位传力框架由定位传力板及上连接板组成,定位传力板呈平行设置,定位传力板两侧通过上连接板连接。本发明施工便捷,能够有效地保证连接处节点的连接强度,并且大幅的缩短施工周期以及节省模板的用量,从而达到节省造价的目的。
Fabricated pool wallboard assembly and construction method
The fabricated pool wallboard assembly comprises an upper positioning force transmission frame and a lower positioning force transmission frame which are connected in a matched mode, a steel bar frame is installed on the upper portion of the upper positioning force transmission frame, and concrete is poured between the upper positioning force transmission frame and the lower positioning force transmission frame and in the steel bar frame; an upper positioning force transmission frame is composed of positioning force transmission plates and upper connecting plates, the positioning force transmission plates are arranged in parallel, and the two sides of the positioning force transmission plates are connected through the upper connecting plates. Construction is convenient and fast, the connecting strength of joints at the connecting position can be effectively guaranteed, the construction period is greatly shortened, the use amount of formworks is reduced, and therefore the purpose of saving the manufacturing cost is achieved.
本发明涉及一种装配式水池壁板组件及施工方法,包括相互配合连接的上定位传力框架和下定位传力框架,上定位传力框架上部安装钢筋架,上定位传力框架和下定位传力框架之间以及钢筋架中灌注混凝土;本发明上定位传力框架由定位传力板及上连接板组成,定位传力板呈平行设置,定位传力板两侧通过上连接板连接。本发明施工便捷,能够有效地保证连接处节点的连接强度,并且大幅的缩短施工周期以及节省模板的用量,从而达到节省造价的目的。
Fabricated pool wallboard assembly and construction method
一种装配式水池壁板组件及施工方法
LI KAI (author) / LIU GANG (author) / YAN YUNYAN (author)
2024-02-13
Patent
Electronic Resource
Chinese
Fabricated wallboard assembly and fabricated wallboard mounting method
European Patent Office | 2024
|Cushion block for fabricated wallboard and assembly method of fabricated wallboard
European Patent Office | 2021
|European Patent Office | 2024
|