A platform for research: civil engineering, architecture and urbanism
Construction method for integrally pouring and forming side wall and upwarp bridging piece
The invention discloses a construction method for integrally pouring and forming a side wall and an upwarp bridging piece, which is characterized in that an inclined turning plate is arranged on a support frame and is used for supporting a template structure of the upwarp bridging piece, so that the template structure is communicated with a lower template and an upper template of the side wall to form a pouring cavity, and the side wall and the upwarp bridging piece are integrally poured. According to the construction method for integrally pouring and forming the side wall and the upwarp bridging piece, the mode that a semi-closed formwork is communicated at a time and integrally poured is adopted, and self-waterproofness of the structure is ensured through one-time forming. According to the invention, the problem of difficulty in one-time pouring forming formwork erecting and pouring of the bridging piece and the side wall of the pool structure is solved.
本发明公开了一种侧墙与上翘挑板一体浇筑成型的施工方法,通过在支撑架上设置斜翻板以用于支撑上翘挑板的模板结构,使得模板结构与侧墙的下部模板、上部模板连通形成浇筑空腔,进而一体浇筑侧墙与上翘挑板。本发明的侧墙与上翘挑板一体浇筑成型的施工方法采用半封闭式模板一次性连通整体浇筑的方式,一次性成型则确保了结构的自防水性。本发明解决了水池结构的挑板与侧壁一次性浇筑成型支模和浇筑存在困难的问题。
Construction method for integrally pouring and forming side wall and upwarp bridging piece
The invention discloses a construction method for integrally pouring and forming a side wall and an upwarp bridging piece, which is characterized in that an inclined turning plate is arranged on a support frame and is used for supporting a template structure of the upwarp bridging piece, so that the template structure is communicated with a lower template and an upper template of the side wall to form a pouring cavity, and the side wall and the upwarp bridging piece are integrally poured. According to the construction method for integrally pouring and forming the side wall and the upwarp bridging piece, the mode that a semi-closed formwork is communicated at a time and integrally poured is adopted, and self-waterproofness of the structure is ensured through one-time forming. According to the invention, the problem of difficulty in one-time pouring forming formwork erecting and pouring of the bridging piece and the side wall of the pool structure is solved.
本发明公开了一种侧墙与上翘挑板一体浇筑成型的施工方法,通过在支撑架上设置斜翻板以用于支撑上翘挑板的模板结构,使得模板结构与侧墙的下部模板、上部模板连通形成浇筑空腔,进而一体浇筑侧墙与上翘挑板。本发明的侧墙与上翘挑板一体浇筑成型的施工方法采用半封闭式模板一次性连通整体浇筑的方式,一次性成型则确保了结构的自防水性。本发明解决了水池结构的挑板与侧壁一次性浇筑成型支模和浇筑存在困难的问题。
Construction method for integrally pouring and forming side wall and upwarp bridging piece
侧墙与上翘挑板一体浇筑成型的施工方法
MO XUEZHOU (author) / LI HANJIE (author) / QIN MINNING (author) / LIANG DONGJING (author) / LU SHIYING (author) / GUO JIN (author) / HUANG YUDI (author)
2024-02-20
Patent
Electronic Resource
Chinese
Construction method for integrally forming building house through secondary pouring
European Patent Office | 2023
|Construction method for integrally pouring concrete into inspection well
European Patent Office | 2021
|Construction structure and method for integrally pouring batter post and cross beam
European Patent Office | 2024
|Construction method for pouring square ditch side wall concrete through movable pouring frame device
European Patent Office | 2023
|