A platform for research: civil engineering, architecture and urbanism
Weathered sand roadbed filling construction device and construction method thereof
The invention discloses a weathered sand subgrade filling construction device and a construction method thereof, relates to the field of weathered sand subgrade filling, and solves the problems that the existing weathered sand subgrade filling construction is carried out by rolling with a road roller, then manually watering and repeatedly rolling with the road roller, which is very troublesome, very time-consuming and labor-consuming, and the construction efficiency is high. And the working efficiency is low. The device is technically characterized by comprising a base; the first supporting structure is mounted on the lower surface of the base, and the first supporting structure is used for supporting; and the moving structure is installed on the lower surface of the first supporting structure, and the moving structure is used for moving. The labor consumption is reduced, the working efficiency is improved, the structure is relatively simple, and the use is convenient.
本发明为风化沙路基填筑施工装置及其施工方法,涉及风化沙路基填筑领域,解决了现有的风化沙路基填筑施工都是先用压路机进行碾压,然后进行人工洒水,在用压路机进行重复碾压,非常的麻烦,非常的消耗时间,也很消耗人力,工作效率较低的问题。技术特征包括:底座;第一支撑结构,所述第一支撑结构安装于底座下表面,且所述第一支撑结构用于支撑;移动结构,所述移动结构安装于第一支撑结构下表面,且所述移动结构用于移动。减少了人力的消耗,增加了工作效率,结构相对简单,使用方便。
Weathered sand roadbed filling construction device and construction method thereof
The invention discloses a weathered sand subgrade filling construction device and a construction method thereof, relates to the field of weathered sand subgrade filling, and solves the problems that the existing weathered sand subgrade filling construction is carried out by rolling with a road roller, then manually watering and repeatedly rolling with the road roller, which is very troublesome, very time-consuming and labor-consuming, and the construction efficiency is high. And the working efficiency is low. The device is technically characterized by comprising a base; the first supporting structure is mounted on the lower surface of the base, and the first supporting structure is used for supporting; and the moving structure is installed on the lower surface of the first supporting structure, and the moving structure is used for moving. The labor consumption is reduced, the working efficiency is improved, the structure is relatively simple, and the use is convenient.
本发明为风化沙路基填筑施工装置及其施工方法,涉及风化沙路基填筑领域,解决了现有的风化沙路基填筑施工都是先用压路机进行碾压,然后进行人工洒水,在用压路机进行重复碾压,非常的麻烦,非常的消耗时间,也很消耗人力,工作效率较低的问题。技术特征包括:底座;第一支撑结构,所述第一支撑结构安装于底座下表面,且所述第一支撑结构用于支撑;移动结构,所述移动结构安装于第一支撑结构下表面,且所述移动结构用于移动。减少了人力的消耗,增加了工作效率,结构相对简单,使用方便。
Weathered sand roadbed filling construction device and construction method thereof
风化沙路基填筑施工装置及其施工方法
XU GUOCHUN (author) / QI SHUHUA (author) / WANG CHENG (author) / SONG ZHUOHUA (author) / GUO YANLING (author) / ZHOU DEXUN (author) / FAN ZHANDING (author) / WANG WENTAO (author)
2024-02-23
Patent
Electronic Resource
Chinese
Aeolian sand roadbed filling construction device and construction method thereof
European Patent Office | 2024
|Construction process for roadbed filling by using weathered phyllite
European Patent Office | 2024
|Sand filling roadbed construction method for municipal roads
European Patent Office | 2020
|