Underground pipe gallery bottom plate slope leakage pre-buried construction structure and pre-buried construction method
The invention relates to the field of civil engineering construction, in particular to an underground pipe gallery bottom plate slope leakage pre-buried construction structure and a pre-buried construction method.The pre-buried construction structure comprises a slope formwork, a pre-buried construction hole is formed in the middle section of the slope formwork, and a pouring side is formed on one side of the slope formwork; the forming die is mounted in the pre-buried construction hole, a mounting hole is formed in the forming die, and the forming die protrudes out of the pouring side of the slope template; the embedded part is mounted in the mounting hole, and the embedded part comprises a connecting rod extending into the pouring side and a mounting block connected to the mounting hole; the forming die is arranged in such a way that a vibration damping part is arranged between the mounting block and the slope template, and the vibration damping part prevents the mounting block from transmitting vibration to the slope template. By optimizing the construction structure and the construction method of the embedded part, the problems existing in the prior art are effectively solved.
本发明涉及土建施工领域,尤其涉及一种地下管廊底板斜坡外漏预埋施工结构及预埋施工方法,预埋施工结构包括:斜坡模板,所述斜坡模板的中段设有预埋构造孔,所述斜坡模板的一侧形成浇筑侧;成型模,安装在所述预埋构造孔,所述成型模设有安装孔,且所述成型模凸出于所述斜坡模板的浇筑侧;预埋件,安装在所安装孔,所述预埋件包括延伸入所浇筑侧的连接杆、连接在所述安装孔的安装块;所述成型模如此设置,以使得所述安装块与所述斜坡模板之间设有阻振部,所述阻振部阻隔所述安装块模向所述斜坡模板传递振动。本发明通过优化了预埋件的施工结构以及施工方法,有效的解决了现有技术中存在的问题。
Underground pipe gallery bottom plate slope leakage pre-buried construction structure and pre-buried construction method
The invention relates to the field of civil engineering construction, in particular to an underground pipe gallery bottom plate slope leakage pre-buried construction structure and a pre-buried construction method.The pre-buried construction structure comprises a slope formwork, a pre-buried construction hole is formed in the middle section of the slope formwork, and a pouring side is formed on one side of the slope formwork; the forming die is mounted in the pre-buried construction hole, a mounting hole is formed in the forming die, and the forming die protrudes out of the pouring side of the slope template; the embedded part is mounted in the mounting hole, and the embedded part comprises a connecting rod extending into the pouring side and a mounting block connected to the mounting hole; the forming die is arranged in such a way that a vibration damping part is arranged between the mounting block and the slope template, and the vibration damping part prevents the mounting block from transmitting vibration to the slope template. By optimizing the construction structure and the construction method of the embedded part, the problems existing in the prior art are effectively solved.
本发明涉及土建施工领域,尤其涉及一种地下管廊底板斜坡外漏预埋施工结构及预埋施工方法,预埋施工结构包括:斜坡模板,所述斜坡模板的中段设有预埋构造孔,所述斜坡模板的一侧形成浇筑侧;成型模,安装在所述预埋构造孔,所述成型模设有安装孔,且所述成型模凸出于所述斜坡模板的浇筑侧;预埋件,安装在所安装孔,所述预埋件包括延伸入所浇筑侧的连接杆、连接在所述安装孔的安装块;所述成型模如此设置,以使得所述安装块与所述斜坡模板之间设有阻振部,所述阻振部阻隔所述安装块模向所述斜坡模板传递振动。本发明通过优化了预埋件的施工结构以及施工方法,有效的解决了现有技术中存在的问题。
Underground pipe gallery bottom plate slope leakage pre-buried construction structure and pre-buried construction method
一种地下管廊底板斜坡外漏预埋施工结构及预埋施工方法
CHEN YAN (author) / YANG GUOQING (author) / ZHANG CHAO (author) / CHAI JITONG (author) / YANG LIN (author)
2024-03-01
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for crossing obstacles on deeply-buried underground comprehensive pipe gallery
European Patent Office | 2024
|European Patent Office | 2016
|Construction method of shallow buried underground structure
European Patent Office | 2024
|