A platform for research: civil engineering, architecture and urbanism
Construction method of shallow buried underground structure
The invention relates to a construction method of a shallow buried underground structure, which comprises the following steps that a guide device is placed on the ground, and the guide device is provided with two arc-shaped guide pipes which are oppositely arranged; the multiple arc-shaped enclosure pipes are sequentially pressed into a soil body through the two guide pipes, and the enclosure pipes pressed into the two sides form an arc-shaped enclosure ring matched with an underground structure; the multiple arc enclosure rings are sequentially constructed in the longitudinal direction of the underground structure till construction of the enclosure structure of the whole underground structure is completed; a soil body in the enclosure structure is excavated; the underground structure is constructed in the enclosure structure, the wall body of the underground structure is constructed on the inner side face of the enclosure structure, and the construction period is shortened by adopting the construction method.
本发明涉及一种浅埋地下结构的施工方法,包括以下步骤:在地面放置导向装置,导向装置具有相对设置的两个弧形的导向管;通过两个导向管依次将多个弧形的围护管压入土体,两侧压入的围护管形成与地下结构相匹配的圆弧型围护圈;沿地下结构纵向依次施工多个圆弧型围护圈,直至完成整个地下结构的围护结构的施工;对围护结构内部的土体进行开挖;在围护结构内部施工地下结构,其中地下结构的墙体在围护结构的内侧面进行施工,采用本发明的施工方法缩短了施工周期。
Construction method of shallow buried underground structure
The invention relates to a construction method of a shallow buried underground structure, which comprises the following steps that a guide device is placed on the ground, and the guide device is provided with two arc-shaped guide pipes which are oppositely arranged; the multiple arc-shaped enclosure pipes are sequentially pressed into a soil body through the two guide pipes, and the enclosure pipes pressed into the two sides form an arc-shaped enclosure ring matched with an underground structure; the multiple arc enclosure rings are sequentially constructed in the longitudinal direction of the underground structure till construction of the enclosure structure of the whole underground structure is completed; a soil body in the enclosure structure is excavated; the underground structure is constructed in the enclosure structure, the wall body of the underground structure is constructed on the inner side face of the enclosure structure, and the construction period is shortened by adopting the construction method.
本发明涉及一种浅埋地下结构的施工方法,包括以下步骤:在地面放置导向装置,导向装置具有相对设置的两个弧形的导向管;通过两个导向管依次将多个弧形的围护管压入土体,两侧压入的围护管形成与地下结构相匹配的圆弧型围护圈;沿地下结构纵向依次施工多个圆弧型围护圈,直至完成整个地下结构的围护结构的施工;对围护结构内部的土体进行开挖;在围护结构内部施工地下结构,其中地下结构的墙体在围护结构的内侧面进行施工,采用本发明的施工方法缩短了施工周期。
Construction method of shallow buried underground structure
一种浅埋地下结构的施工方法
LI JUN (author) / MA ZHENG (author) / ZHENG ZHICHAO (author) / ZHENG ZHAOYI (author) / ZHANG WEN (author) / ZHANG RUI (author) / WANG DONGMING (author)
2024-11-15
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Shallow-buried underground pipeline protection structure and construction method thereof
European Patent Office | 2023
|European Patent Office | 2023
|Shallow buried rock stratum section underground continuous wall grooving construction method
European Patent Office | 2020
|European Patent Office | 2021
|