Construction method for hydraulically and rapidly tamping foundation
The invention discloses a construction method for hydraulically and rapidly tamping a foundation, which specifically comprises the following steps: S1, cleaning and leveling a construction site, and marking the position of a first tamping point; s2, the crane is in place, and the tamping plate is aligned with the tamping point position; s3, controlling the dustproof cover to descend through a driving mechanism until the wear-resistant ring is in contact with the ground; and S4, the hydraulic oil cylinder drives the tamping plate to move up and down through the tamping block, so that the tamping point position is hammered and tamped. According to the construction method for hydraulically and rapidly tamping the foundation, most dust in the tamping process can be isolated through the arrangement of the dust cover, and a small amount of dust overflowing from the dust cover can be collected in time through the arrangement of the dust collection mechanism, so that air pollution caused by the dust is avoided; and meanwhile, the problem that the dust impurities are inhaled by the human body and consequently respiratory tract injuries are caused can be avoided, the collected dust impurities can be discharged to the ground at a constant speed after tamping is completed, and secondary flying is avoided.
本发明公开了一种液压快速夯实地基的施工方法,具体包括以下步骤:S1、清理并平整施工场地,标出第一遍夯点位置;S2、起重机就位,使夯实板对准夯点位置;S3、通过驱动机构控制防尘罩下降,直至耐磨圈与地面接触;S4、使得液压油缸通过夯实块带动夯实板上下运动,从而对夯点位置进行锤击夯实,本发明涉及夯实地基技术领域。该液压快速夯实地基的施工方法,通过防尘罩的设置能够隔绝夯实过程中大部分的粉尘,并且通过吸尘机构的设置能够对防尘罩外溢的少量粉尘及时进行收集,避免粉尘造成的空气污染,同时也能够避免被人体吸入从而造成呼吸道损伤的问题,被收集的粉尘杂质在夯实完成后能够匀速排放至地面,避免造成二次飞扬。
Construction method for hydraulically and rapidly tamping foundation
The invention discloses a construction method for hydraulically and rapidly tamping a foundation, which specifically comprises the following steps: S1, cleaning and leveling a construction site, and marking the position of a first tamping point; s2, the crane is in place, and the tamping plate is aligned with the tamping point position; s3, controlling the dustproof cover to descend through a driving mechanism until the wear-resistant ring is in contact with the ground; and S4, the hydraulic oil cylinder drives the tamping plate to move up and down through the tamping block, so that the tamping point position is hammered and tamped. According to the construction method for hydraulically and rapidly tamping the foundation, most dust in the tamping process can be isolated through the arrangement of the dust cover, and a small amount of dust overflowing from the dust cover can be collected in time through the arrangement of the dust collection mechanism, so that air pollution caused by the dust is avoided; and meanwhile, the problem that the dust impurities are inhaled by the human body and consequently respiratory tract injuries are caused can be avoided, the collected dust impurities can be discharged to the ground at a constant speed after tamping is completed, and secondary flying is avoided.
本发明公开了一种液压快速夯实地基的施工方法,具体包括以下步骤:S1、清理并平整施工场地,标出第一遍夯点位置;S2、起重机就位,使夯实板对准夯点位置;S3、通过驱动机构控制防尘罩下降,直至耐磨圈与地面接触;S4、使得液压油缸通过夯实块带动夯实板上下运动,从而对夯点位置进行锤击夯实,本发明涉及夯实地基技术领域。该液压快速夯实地基的施工方法,通过防尘罩的设置能够隔绝夯实过程中大部分的粉尘,并且通过吸尘机构的设置能够对防尘罩外溢的少量粉尘及时进行收集,避免粉尘造成的空气污染,同时也能够避免被人体吸入从而造成呼吸道损伤的问题,被收集的粉尘杂质在夯实完成后能够匀速排放至地面,避免造成二次飞扬。
Construction method for hydraulically and rapidly tamping foundation
一种液压快速夯实地基的施工方法
GUO LIPING (author) / ZHANG LU (author) / LIU YANG (author) / PAN MINGQIN (author)
2024-03-08
Patent
Electronic Resource
Chinese
Construction method for hydraulically tamping foundation
European Patent Office | 2023
|Construction method for rapidly tamping foundation through hydraulic pressure
European Patent Office | 2021
|