A platform for research: civil engineering, architecture and urbanism
Rail of bridge girder erection machine
The invention relates to a track of a bridge girder erection machine, which comprises a plurality of bases which can be spliced with one another, each base is in a plate shape, a limiting strip is arranged on each base, the limiting strips are used for being matched with the bridge girder erection machine to guide and limit the movement of the bridge girder erection machine, when the bases are spliced with one another, the plate surfaces of the bases are flush, and the limiting strips are also spliced with one another. The limiting strips are located on the same straight line, and fixing mechanisms are arranged on the bases and used for fixing the two spliced bases. After the bridge erecting machine finishes erecting a bridge of a current section, a constructor can dismantle the base of the track section which is used up and then splice the base on the section to be constructed again, so that the whole machine does not need to be dismantled when the bridge erecting machine erects a bridge of a linear section, and construction can be continued only by dismantling the track and then splicing and forming again. And compared with the whole machine dismounting, the workload of dismounting the track is greatly reduced, the dismounting is more convenient, and the construction efficiency of bridge construction is greatly improved.
本申请涉及一种架桥机的轨道,包括若干可相互拼合的底座,底座呈板状,底座上均设置有一根限位条,限位条用于与架桥机配合对架桥机的移动进行导向和限位,当底座相互拼合时,底座的板面齐平,限位条也相互拼合,且限位条位于同一直线上,底座上设置有固定机构以用于固定两个相互拼合的底座。当架桥机将当前段的桥梁架设完毕后,施工人员可将已经使用完毕的轨道段的底座拆除,然后重新在将要施工段上进行拼接,使得架桥机在架设直线段的桥梁的过程中,无需拆卸整机,仅需拆卸轨道然后进行重新拼装成型,即可继续施工,相比较拆卸整机,拆卸轨道的工作量大大降低,拆卸较为方便,极大地提高了桥梁建设的建设效率。
Rail of bridge girder erection machine
The invention relates to a track of a bridge girder erection machine, which comprises a plurality of bases which can be spliced with one another, each base is in a plate shape, a limiting strip is arranged on each base, the limiting strips are used for being matched with the bridge girder erection machine to guide and limit the movement of the bridge girder erection machine, when the bases are spliced with one another, the plate surfaces of the bases are flush, and the limiting strips are also spliced with one another. The limiting strips are located on the same straight line, and fixing mechanisms are arranged on the bases and used for fixing the two spliced bases. After the bridge erecting machine finishes erecting a bridge of a current section, a constructor can dismantle the base of the track section which is used up and then splice the base on the section to be constructed again, so that the whole machine does not need to be dismantled when the bridge erecting machine erects a bridge of a linear section, and construction can be continued only by dismantling the track and then splicing and forming again. And compared with the whole machine dismounting, the workload of dismounting the track is greatly reduced, the dismounting is more convenient, and the construction efficiency of bridge construction is greatly improved.
本申请涉及一种架桥机的轨道,包括若干可相互拼合的底座,底座呈板状,底座上均设置有一根限位条,限位条用于与架桥机配合对架桥机的移动进行导向和限位,当底座相互拼合时,底座的板面齐平,限位条也相互拼合,且限位条位于同一直线上,底座上设置有固定机构以用于固定两个相互拼合的底座。当架桥机将当前段的桥梁架设完毕后,施工人员可将已经使用完毕的轨道段的底座拆除,然后重新在将要施工段上进行拼接,使得架桥机在架设直线段的桥梁的过程中,无需拆卸整机,仅需拆卸轨道然后进行重新拼装成型,即可继续施工,相比较拆卸整机,拆卸轨道的工作量大大降低,拆卸较为方便,极大地提高了桥梁建设的建设效率。
Rail of bridge girder erection machine
一种架桥机的轨道
CHENG LI (author) / ZHANG JINWEN (author)
2024-03-15
Patent
Electronic Resource
Chinese
Bridge girder erection machine and via hole girder erection method of bridge girder erection machine
European Patent Office | 2024
|Bridge girder erection machine and via hole girder erection method of bridge girder erection machine
European Patent Office | 2024
|European Patent Office | 2024
|Bridge girder erection machine and bridging method of bridge girder erection machine
European Patent Office | 2020
|