A platform for research: civil engineering, architecture and urbanism
Fabricated prestressed concrete pool connected by UHPC (Ultra High Performance Concrete) and construction method
The invention relates to a fabricated prestressed concrete pool connected through UHPC and a construction method, and belongs to the technical field of reinforced concrete pools. Comprising a reinforced concrete bottom plate, cup foundations are arranged on the edge of the top of the reinforced concrete bottom plate, prefabricated wall plates are arranged between the cup foundations, prefabricated buttress columns are arranged between the prefabricated wall plates, steel reinforcement frameworks are arranged in the prefabricated buttress columns and the prefabricated wall plates respectively, and anchoring assemblies are arranged on the two sides of each prefabricated buttress column respectively; joints among the cup foundation, the reinforced concrete bottom plate and the prefabricated wall plates are filled with UHPC (Ultra High Performance Concrete) and waterproof materials; the method can effectively solve the problems of many procedures, long construction period, insufficient environmental protection and low economic benefit when the pool construction operation is carried out by adopting an integral pouring mode in the prior art.
本发明涉及采用UHPC连接的装配式预应力混凝土水池及施工方法,属于钢筋混凝土水池技术领域。包括钢筋混凝土底板,其顶部的边缘处设置有杯口基础,杯口基础间设置有预制壁板,预制壁板之间设置有预制扶壁柱,所述预制扶壁柱和预制壁板的内部分别设置有钢筋骨架,预制扶壁柱的两侧分别设置有锚固组件;杯口基础与钢筋混凝土底板、预制壁板间的接缝处填充有UHPC超高性能混凝土以及防水材料;本发明能有效解决现有采用一体浇筑的方式进行水池建造作业时工序多、工期长、不够环保、经济效益不高的问题。
Fabricated prestressed concrete pool connected by UHPC (Ultra High Performance Concrete) and construction method
The invention relates to a fabricated prestressed concrete pool connected through UHPC and a construction method, and belongs to the technical field of reinforced concrete pools. Comprising a reinforced concrete bottom plate, cup foundations are arranged on the edge of the top of the reinforced concrete bottom plate, prefabricated wall plates are arranged between the cup foundations, prefabricated buttress columns are arranged between the prefabricated wall plates, steel reinforcement frameworks are arranged in the prefabricated buttress columns and the prefabricated wall plates respectively, and anchoring assemblies are arranged on the two sides of each prefabricated buttress column respectively; joints among the cup foundation, the reinforced concrete bottom plate and the prefabricated wall plates are filled with UHPC (Ultra High Performance Concrete) and waterproof materials; the method can effectively solve the problems of many procedures, long construction period, insufficient environmental protection and low economic benefit when the pool construction operation is carried out by adopting an integral pouring mode in the prior art.
本发明涉及采用UHPC连接的装配式预应力混凝土水池及施工方法,属于钢筋混凝土水池技术领域。包括钢筋混凝土底板,其顶部的边缘处设置有杯口基础,杯口基础间设置有预制壁板,预制壁板之间设置有预制扶壁柱,所述预制扶壁柱和预制壁板的内部分别设置有钢筋骨架,预制扶壁柱的两侧分别设置有锚固组件;杯口基础与钢筋混凝土底板、预制壁板间的接缝处填充有UHPC超高性能混凝土以及防水材料;本发明能有效解决现有采用一体浇筑的方式进行水池建造作业时工序多、工期长、不够环保、经济效益不高的问题。
Fabricated prestressed concrete pool connected by UHPC (Ultra High Performance Concrete) and construction method
采用UHPC连接的装配式预应力混凝土水池及施工方法
SUKETOSHI (author) / YANG TAO (author) / TANG ZHENYUN (author) / MEI XIAOLI (author) / ZHANG XIUPING (author) / LI YUNJIA (author)
2024-03-19
Patent
Electronic Resource
Chinese
Fabricated prestressed UHPC (Ultra High Performance Concrete) curtain wall plate
European Patent Office | 2023
|Fabricated UHPC (Ultra High Performance Concrete) drainage structure
European Patent Office | 2021
|European Patent Office | 2024
|European Patent Office | 2022
|