A platform for research: civil engineering, architecture and urbanism
The invention provides an integrated assembly type steel structure building, and relates to the field of steel structure constructions.The integrated assembly type steel structure building comprises a building body, an obliquely-arranged shielding structure is fixedly installed at the upper end of the building body and comprises a first shielding plate and a second shielding plate, and the second shielding plate is fixed to the upper end of the building body and is obliquely arranged; the first shielding plate is located above the second shielding plate and is obliquely arranged, the first shielding plate and the second shielding plate are arranged to be a first end and a second end according to the vertical height, the height of the first end is larger than that of the second end, and the first end of the first shielding plate and the first end of the second shielding plate are movably connected through a connecting part; the upper end of the second shielding plate is slidably connected with a first mounting seat, the lower end of the first shielding plate is fixedly connected with a second mounting seat, and the upper end of the first mounting seat is rotatably connected with a supporting plate. The problem of how to remove accumulated snow at the top end of the steel structure building is solved.
本发明提供一种集成装配式钢结构建筑,涉及钢结构建筑领域,包括建筑主体,所述建筑主体上端安装固定有倾斜设置的遮挡结构所述遮挡结构包括第一遮挡板以及第二遮挡板,所述第二遮挡板固定于建筑主体上端并且倾斜设置,所述第一遮挡板位于第二遮挡板上方并且倾斜设置,所述第一遮挡板以及第二遮挡板根据竖直高度分别设置为第一端和第二端,其中第一端高度大于第二端高度,所述第一遮挡板以及第二遮挡板第一端之间通过连接部件活动连接,所述第二遮挡板上端滑动连接有第一安装座,所述第一遮挡板下端固定连接有第二安装座,所述第一安装座上端转动连接有支撑板。该发明解决了如何对钢结构建筑顶端的积雪进行祛除的问题。
The invention provides an integrated assembly type steel structure building, and relates to the field of steel structure constructions.The integrated assembly type steel structure building comprises a building body, an obliquely-arranged shielding structure is fixedly installed at the upper end of the building body and comprises a first shielding plate and a second shielding plate, and the second shielding plate is fixed to the upper end of the building body and is obliquely arranged; the first shielding plate is located above the second shielding plate and is obliquely arranged, the first shielding plate and the second shielding plate are arranged to be a first end and a second end according to the vertical height, the height of the first end is larger than that of the second end, and the first end of the first shielding plate and the first end of the second shielding plate are movably connected through a connecting part; the upper end of the second shielding plate is slidably connected with a first mounting seat, the lower end of the first shielding plate is fixedly connected with a second mounting seat, and the upper end of the first mounting seat is rotatably connected with a supporting plate. The problem of how to remove accumulated snow at the top end of the steel structure building is solved.
本发明提供一种集成装配式钢结构建筑,涉及钢结构建筑领域,包括建筑主体,所述建筑主体上端安装固定有倾斜设置的遮挡结构所述遮挡结构包括第一遮挡板以及第二遮挡板,所述第二遮挡板固定于建筑主体上端并且倾斜设置,所述第一遮挡板位于第二遮挡板上方并且倾斜设置,所述第一遮挡板以及第二遮挡板根据竖直高度分别设置为第一端和第二端,其中第一端高度大于第二端高度,所述第一遮挡板以及第二遮挡板第一端之间通过连接部件活动连接,所述第二遮挡板上端滑动连接有第一安装座,所述第一遮挡板下端固定连接有第二安装座,所述第一安装座上端转动连接有支撑板。该发明解决了如何对钢结构建筑顶端的积雪进行祛除的问题。
Integrated assembly type steel structure building
一种集成装配式钢结构建筑
2024-03-22
Patent
Electronic Resource
Chinese
Integrated assembly type steel structure environment-friendly building
European Patent Office | 2021
|Prefabricated steel structure integrated assembly type green building component
European Patent Office | 2021
|Prefabricated steel structure integrated assembly type green building component
European Patent Office | 2022
|