Integrated construction method of super high-rise vertical structure
The invention discloses an integrated construction method of a super high-rise vertical structure, and relates to the technical field of constructional engineering. The problems that a creeping formwork technology and a building machine technology have defects are solved. The method specifically comprises the following steps that the super high-rise vertical structure is divided into a plurality of construction sections, and the process of each construction section is formulated; and pre-embedding construction anchor points of the embedded parts according to a construction section design process. A plurality of structures such as an external hanging construction platform, an internal hanging construction platform, an internal and external wall large formwork system, a hydraulic concrete spreader and edge protection are integrated, a main body structure is formed by connecting high-strength steel components through bolts, the whole frame body is light, easy to disassemble and assemble and short in time efficiency, machine positions are in hard connection through the frame body, stress suspension points are multiple, and the construction efficiency is high. The construction industrialization level is greatly improved, the construction safety is improved, the workload of workers is reduced, the construction efficiency and the comfort degree of the working environment of the workers are improved, and the method is suitable for integrated construction of the super high-rise vertical structure and easy to popularize.
本发明公开了一种超高层竖向结构的一体化施工方法,涉及建筑工程技术领域。为了解决爬模技术和造楼机技术存在不足的问题;具体包括如下步骤:将超高层竖向结构划分为多个施工段,并制定各个施工段的工艺;按照施工段设计工艺进行预埋件施工锚点预埋。本发明集外挂施工平台、内挂施工平台、内外墙大模板系统、液压混凝土布料机、临边防护等多种结构于一体,主体结构采用高强型钢构件通过螺栓连接而成,整体架体轻便,拆装简单,时效短,机位之间有架体硬连接,受力悬挂点多,大大提高了建造的工业化水平,提高了施工的安全性,减少了工人的工作量,提高了施工效率和工人工作环境的舒适度,适用于超高层竖向结构的一体化施工,易于推广。
Integrated construction method of super high-rise vertical structure
The invention discloses an integrated construction method of a super high-rise vertical structure, and relates to the technical field of constructional engineering. The problems that a creeping formwork technology and a building machine technology have defects are solved. The method specifically comprises the following steps that the super high-rise vertical structure is divided into a plurality of construction sections, and the process of each construction section is formulated; and pre-embedding construction anchor points of the embedded parts according to a construction section design process. A plurality of structures such as an external hanging construction platform, an internal hanging construction platform, an internal and external wall large formwork system, a hydraulic concrete spreader and edge protection are integrated, a main body structure is formed by connecting high-strength steel components through bolts, the whole frame body is light, easy to disassemble and assemble and short in time efficiency, machine positions are in hard connection through the frame body, stress suspension points are multiple, and the construction efficiency is high. The construction industrialization level is greatly improved, the construction safety is improved, the workload of workers is reduced, the construction efficiency and the comfort degree of the working environment of the workers are improved, and the method is suitable for integrated construction of the super high-rise vertical structure and easy to popularize.
本发明公开了一种超高层竖向结构的一体化施工方法,涉及建筑工程技术领域。为了解决爬模技术和造楼机技术存在不足的问题;具体包括如下步骤:将超高层竖向结构划分为多个施工段,并制定各个施工段的工艺;按照施工段设计工艺进行预埋件施工锚点预埋。本发明集外挂施工平台、内挂施工平台、内外墙大模板系统、液压混凝土布料机、临边防护等多种结构于一体,主体结构采用高强型钢构件通过螺栓连接而成,整体架体轻便,拆装简单,时效短,机位之间有架体硬连接,受力悬挂点多,大大提高了建造的工业化水平,提高了施工的安全性,减少了工人的工作量,提高了施工效率和工人工作环境的舒适度,适用于超高层竖向结构的一体化施工,易于推广。
Integrated construction method of super high-rise vertical structure
一种超高层竖向结构的一体化施工方法
CHEN JINGTAO (author) / WANG YONGSHENG (author) / WANG YISHU (author) / WU YI (author) / HAN XU (author) / WANG HE (author) / ZHANG JIANAN (author)
2024-03-22
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Super-high-rise construction waste vertical transportation system
European Patent Office | 2020
|Vertical deformation construction monitoring method for super high-rise building
European Patent Office | 2021
|Modular construction method for vertical pipe of super high-rise pipe well
European Patent Office | 2023
|Construction method of super high-rise aerial corridor structure
European Patent Office | 2020
|Super high-rise eccentric structure construction perpendicularity control method
European Patent Office | 2024
|