A platform for research: civil engineering, architecture and urbanism
Tunnel inverted arch filling temperature and humidity maintenance system
The invention discloses a tunnel inverted arch filling temperature and humidity protection system which comprises a maintenance component which comprises an inverted arch body, a filling assembly arranged on the inverted arch body, a connecting assembly arranged on the filling assembly, a maintenance assembly arranged on the connecting assembly and a containing assembly arranged on the maintenance assembly. The cleaning assembly is arranged on the accommodating assembly; the filling assembly comprises a filling side mold arranged on the inverted arch body and an inverted arch filling opening formed in the filling side mold, the top of inverted arch filling is covered with a curing cover, an air inlet hole is formed in the curing cover, steam can be injected into the curing cover through the air inlet hole by means of a steam generator after inverted arch filling pouring is completed, the curing cover is sealed, and the inverted arch filling opening is formed in the curing cover. It is ensured that inverted arch filling is maintained under the proper temperature and humidity condition, inverted arch filling strengthening is accelerated, and the problems that surface cracking is likely to be caused due to the fact that tunnel inverted arch filling maintenance is not in place, heavy load loading time is delayed or surface damage is caused when heavy loads are borne in advance can be effectively solved.
本发明公开了一种隧道仰拱填充温湿保护系统,包括养护部件,包括仰拱本体,设置于仰拱本体上的填充组件,设置于所述填充组件上的连接组件,设置于所述连接组件上的养护组件,设置于所述养护组件上的收容组件,以及设置于所述收容组件上的清理组件;填充组件,包括设置于所述仰拱本体上的填充侧模,设置于所述填充侧模上的仰拱填充口,通过在仰拱填充顶部覆盖养护罩,在养护罩上设置进气孔,可在仰拱填充浇筑完成后利用蒸汽发生器通过进气孔向养护罩内注入蒸汽,养护罩密封,确保仰拱填充在合适的温湿条件下养护,加快仰拱填充上强,能有效解决隧道仰拱填充养护不到位易造成表面开裂、上重载时间推迟或提前承受重载时造成表面破坏等问题。
Tunnel inverted arch filling temperature and humidity maintenance system
The invention discloses a tunnel inverted arch filling temperature and humidity protection system which comprises a maintenance component which comprises an inverted arch body, a filling assembly arranged on the inverted arch body, a connecting assembly arranged on the filling assembly, a maintenance assembly arranged on the connecting assembly and a containing assembly arranged on the maintenance assembly. The cleaning assembly is arranged on the accommodating assembly; the filling assembly comprises a filling side mold arranged on the inverted arch body and an inverted arch filling opening formed in the filling side mold, the top of inverted arch filling is covered with a curing cover, an air inlet hole is formed in the curing cover, steam can be injected into the curing cover through the air inlet hole by means of a steam generator after inverted arch filling pouring is completed, the curing cover is sealed, and the inverted arch filling opening is formed in the curing cover. It is ensured that inverted arch filling is maintained under the proper temperature and humidity condition, inverted arch filling strengthening is accelerated, and the problems that surface cracking is likely to be caused due to the fact that tunnel inverted arch filling maintenance is not in place, heavy load loading time is delayed or surface damage is caused when heavy loads are borne in advance can be effectively solved.
本发明公开了一种隧道仰拱填充温湿保护系统,包括养护部件,包括仰拱本体,设置于仰拱本体上的填充组件,设置于所述填充组件上的连接组件,设置于所述连接组件上的养护组件,设置于所述养护组件上的收容组件,以及设置于所述收容组件上的清理组件;填充组件,包括设置于所述仰拱本体上的填充侧模,设置于所述填充侧模上的仰拱填充口,通过在仰拱填充顶部覆盖养护罩,在养护罩上设置进气孔,可在仰拱填充浇筑完成后利用蒸汽发生器通过进气孔向养护罩内注入蒸汽,养护罩密封,确保仰拱填充在合适的温湿条件下养护,加快仰拱填充上强,能有效解决隧道仰拱填充养护不到位易造成表面开裂、上重载时间推迟或提前承受重载时造成表面破坏等问题。
Tunnel inverted arch filling temperature and humidity maintenance system
一种隧道仰拱填充温湿养护系统
LE HONGLEI (author) / ZHANG ZHANJUN (author) / PENG BO (author) / LIU WENWEN (author) / SUN JINGMAO (author) / FANG YANCHAO (author) / LI RUJUN (author) / LIU JIE (author) / CHEN YUANYUAN (author) / SONG PENG (author)
2024-03-22
Patent
Electronic Resource
Chinese
Fabricated tunnel bottom structure replacing inverted arch filling layer and construction method
European Patent Office | 2021
|Highway tunnel inverted arch replacement construction method
European Patent Office | 2021
|European Patent Office | 2024
|