A platform for research: civil engineering, architecture and urbanism
Tunnel inverted arch red mud base filling layer material and preparation and construction method thereof
The invention relates to the field of tunnel inverted arch filling materials, filling layer construction and industrial solid waste utilization, in particular to a tunnel inverted arch red mud base filling layer material and a preparation and construction method. The red-mud-based filling layer material comprises the following components: red mud, lime, cement, steel slag, disodium ethylene diamine tetraacetate, water and a Tushenda curing agent. The tunnel inverted arch red mud base filling layer material is prepared from, by mass, 51.7% of red mud, 5.8% of lime, 5.8% of cement, 11.6% of steel slag, 5.8% of ethylene diamine tetraacetic acid disodium salt, 16.1% of water and 3.2% of a Haenda curing agent, the density of the red mud base filling layer material is about 2.0 t/m < 3 >, the unconfined compressive strength within 28 days can exceed 7.0 MPa, the preparation process is simple, and the cost is low. The strength of the red mud-based filling material obtained after red mud modification meets the requirements of tunnel inverted arch filling layer materials.
本发明涉及隧道仰拱填充材料、填充层施工和工业固废利用领域,具体的说是一种隧道仰拱赤泥基填充层材料及配制、施作方法。赤泥基填充层材料包括以下组分:赤泥、石灰、水泥、钢渣、乙二胺四乙酸二钠、水及途胜达固化剂。所述隧道仰拱赤泥基填充层材料按质量百分比由51.7%的赤泥、5.8%的石灰、5.8%的水泥、11.6%的钢渣、5.8%的乙二胺四乙酸二钠、16.1%的水和3.2%的途胜达固化剂组成,赤泥基填充层材料密度约为2.0t/m3,28天无侧限抗压强度可超过7.0MPa,配制工艺简单,赤泥改性后得到的赤泥基填充料强度满足隧道仰拱填充层材料要求。
Tunnel inverted arch red mud base filling layer material and preparation and construction method thereof
The invention relates to the field of tunnel inverted arch filling materials, filling layer construction and industrial solid waste utilization, in particular to a tunnel inverted arch red mud base filling layer material and a preparation and construction method. The red-mud-based filling layer material comprises the following components: red mud, lime, cement, steel slag, disodium ethylene diamine tetraacetate, water and a Tushenda curing agent. The tunnel inverted arch red mud base filling layer material is prepared from, by mass, 51.7% of red mud, 5.8% of lime, 5.8% of cement, 11.6% of steel slag, 5.8% of ethylene diamine tetraacetic acid disodium salt, 16.1% of water and 3.2% of a Haenda curing agent, the density of the red mud base filling layer material is about 2.0 t/m < 3 >, the unconfined compressive strength within 28 days can exceed 7.0 MPa, the preparation process is simple, and the cost is low. The strength of the red mud-based filling material obtained after red mud modification meets the requirements of tunnel inverted arch filling layer materials.
本发明涉及隧道仰拱填充材料、填充层施工和工业固废利用领域,具体的说是一种隧道仰拱赤泥基填充层材料及配制、施作方法。赤泥基填充层材料包括以下组分:赤泥、石灰、水泥、钢渣、乙二胺四乙酸二钠、水及途胜达固化剂。所述隧道仰拱赤泥基填充层材料按质量百分比由51.7%的赤泥、5.8%的石灰、5.8%的水泥、11.6%的钢渣、5.8%的乙二胺四乙酸二钠、16.1%的水和3.2%的途胜达固化剂组成,赤泥基填充层材料密度约为2.0t/m3,28天无侧限抗压强度可超过7.0MPa,配制工艺简单,赤泥改性后得到的赤泥基填充料强度满足隧道仰拱填充层材料要求。
Tunnel inverted arch red mud base filling layer material and preparation and construction method thereof
一种隧道仰拱赤泥基填充层材料及配制、施作方法
RAO JUNYING (author) / CUI HONGCHAO (author) / LIU CHANG (author) / WU PINGYANG (author)
2024-09-27
Patent
Electronic Resource
Chinese
Fabricated tunnel bottom structure replacing inverted arch filling layer and construction method
European Patent Office | 2021
|Highway tunnel inverted arch replacement construction method
European Patent Office | 2021
|Tunnel inverted arch filling temperature and humidity maintenance system
European Patent Office | 2024
|