A platform for research: civil engineering, architecture and urbanism
The invention discloses steel structure bridge analysis frame mounting equipment which comprises an analysis frame and a pair of vertical frames used for mounting the analysis frame, mounting frames are symmetrically arranged on the opposite sides of the two vertical frames, lifting mechanisms are arranged on the two mounting frames, and correction mechanisms are arranged on the lifting mechanisms; the lifting mechanism comprises a hydraulic lifter arranged at the upper end of the mounting frame, a steel strand is arranged at the bottom end of the hydraulic lifter, a carrying plate used for bearing the analysis frame is arranged between the two vertical frames, and extension arms are symmetrically and fixedly connected to the side walls of the two ends of the carrying plate. According to the steel structure bridge separation frame installation equipment, lifting installation of a separation frame can be achieved through mutual cooperation of the arranged lifting mechanism and the arranged correcting mechanism, the separation frame and the carrier plate are crossed at the beginning, then two vertical frames are avoided, when the separation frame lifts the top of the vertical frame, the separation frame is automatically corrected, and then the separation frame moves downwards to correspond to the vertical frames; and installation of the separation frame and the vertical frame is facilitated.
本发明公开了一种钢结构桥梁析架安装设备,包括析架以及用于安装析架的一对立架,两个所述立架的相背一侧对称设置有安装架,两个所述安装架上设置有提升机构,所述提升机构上设置有纠正机构;所述提升机构包括设置于安装架上端液压提升器,所述液压提升器的底端设置有钢绞线,两个所述立架之间设置有用于承托析架的载板,所述载板的两端侧壁对称固定连接有延长臂。该钢结构桥梁析架安装设备,通过设置的提升机构与纠正机构相互配合可以实现析架的提升安装,初始时使得析架与载板呈交叉状,进而避开两个立架,当析架提升直立架的顶部时析架被自动纠正,然后下移即可实现与立架的对应,便于析架与立架的安装。
The invention discloses steel structure bridge analysis frame mounting equipment which comprises an analysis frame and a pair of vertical frames used for mounting the analysis frame, mounting frames are symmetrically arranged on the opposite sides of the two vertical frames, lifting mechanisms are arranged on the two mounting frames, and correction mechanisms are arranged on the lifting mechanisms; the lifting mechanism comprises a hydraulic lifter arranged at the upper end of the mounting frame, a steel strand is arranged at the bottom end of the hydraulic lifter, a carrying plate used for bearing the analysis frame is arranged between the two vertical frames, and extension arms are symmetrically and fixedly connected to the side walls of the two ends of the carrying plate. According to the steel structure bridge separation frame installation equipment, lifting installation of a separation frame can be achieved through mutual cooperation of the arranged lifting mechanism and the arranged correcting mechanism, the separation frame and the carrier plate are crossed at the beginning, then two vertical frames are avoided, when the separation frame lifts the top of the vertical frame, the separation frame is automatically corrected, and then the separation frame moves downwards to correspond to the vertical frames; and installation of the separation frame and the vertical frame is facilitated.
本发明公开了一种钢结构桥梁析架安装设备,包括析架以及用于安装析架的一对立架,两个所述立架的相背一侧对称设置有安装架,两个所述安装架上设置有提升机构,所述提升机构上设置有纠正机构;所述提升机构包括设置于安装架上端液压提升器,所述液压提升器的底端设置有钢绞线,两个所述立架之间设置有用于承托析架的载板,所述载板的两端侧壁对称固定连接有延长臂。该钢结构桥梁析架安装设备,通过设置的提升机构与纠正机构相互配合可以实现析架的提升安装,初始时使得析架与载板呈交叉状,进而避开两个立架,当析架提升直立架的顶部时析架被自动纠正,然后下移即可实现与立架的对应,便于析架与立架的安装。
Steel structure bridge separated frame installation equipment and installation method thereof
一种钢结构桥梁析架安装设备及其安装方法
HUANG YAN (author)
2024-03-26
Patent
Electronic Resource
Chinese
STEEL BRIDGE WIDENING INSTALLATION DEVICE AND STEEL BRIDGE WIDENING INSTALLATION METHOD
European Patent Office | 2019
|European Patent Office | 2024
|Installation construction method for quickly erecting steel frame bridge
European Patent Office | 2023
|Steel structure building auxiliary installation equipment and auxiliary installation method thereof
European Patent Office | 2023
|