A platform for research: civil engineering, architecture and urbanism
Prefabricated construction method of corrugated steel plate wall
The invention provides a preassembling construction method of a corrugated steel plate wall, and relates to the technical field of fabricated buildings, which comprises the following steps: mounting a lower steel beam: taking a steel beam, and mounting the steel beam on a foundation or a bearing column; a corrugated steel plate wall is installed, specifically, the lower end of the corrugated steel plate wall and the steel beam are positioned through a limiting piece, and the corrugated steel plate wall is connected to the upper portion of the steel beam after positioning is completed; after the lower end of the corrugated steel plate wall is connected with the steel beam, another steel beam is taken, the upper end of the corrugated steel plate wall and the steel beam are positioned through the limiting piece, and after positioning is completed, the steel beam is connected with the upper end of the corrugated steel plate wall. The corrugated steel plate wall has the effect of facilitating installation of the corrugated steel plate wall.
本申请提供了一种波纹钢板墙的预装施工方法,涉及装配式建筑技术领域,其包括如下步骤:安装下钢梁:取一根钢梁,将钢梁安装在地基或承重柱上;安装波纹钢板墙:利用限位件对波纹钢板墙的下端部与所述钢梁进行定位,定位完成后将所述波纹钢板墙连接在所述钢梁的上方;安装上钢梁:待所述波纹钢板墙的下端与所述钢梁连接后,取另一根所述钢梁,利用所述限位件对所述波纹钢板墙的上端与该钢梁进行定位,定位完成后将所述钢梁与所述波纹钢板墙的上端部连接。本申请具有便于波纹钢板墙进行安装的效果。
Prefabricated construction method of corrugated steel plate wall
The invention provides a preassembling construction method of a corrugated steel plate wall, and relates to the technical field of fabricated buildings, which comprises the following steps: mounting a lower steel beam: taking a steel beam, and mounting the steel beam on a foundation or a bearing column; a corrugated steel plate wall is installed, specifically, the lower end of the corrugated steel plate wall and the steel beam are positioned through a limiting piece, and the corrugated steel plate wall is connected to the upper portion of the steel beam after positioning is completed; after the lower end of the corrugated steel plate wall is connected with the steel beam, another steel beam is taken, the upper end of the corrugated steel plate wall and the steel beam are positioned through the limiting piece, and after positioning is completed, the steel beam is connected with the upper end of the corrugated steel plate wall. The corrugated steel plate wall has the effect of facilitating installation of the corrugated steel plate wall.
本申请提供了一种波纹钢板墙的预装施工方法,涉及装配式建筑技术领域,其包括如下步骤:安装下钢梁:取一根钢梁,将钢梁安装在地基或承重柱上;安装波纹钢板墙:利用限位件对波纹钢板墙的下端部与所述钢梁进行定位,定位完成后将所述波纹钢板墙连接在所述钢梁的上方;安装上钢梁:待所述波纹钢板墙的下端与所述钢梁连接后,取另一根所述钢梁,利用所述限位件对所述波纹钢板墙的上端与该钢梁进行定位,定位完成后将所述钢梁与所述波纹钢板墙的上端部连接。本申请具有便于波纹钢板墙进行安装的效果。
Prefabricated construction method of corrugated steel plate wall
一种波纹钢板墙的预装施工方法
JI CHAOCHAO (author) / WU YILIN (author) / LI XIANSONG (author) / LU YIHUI (author) / ZHAO YIHENG (author) / LIANG JIAWEI (author)
2024-03-26
Patent
Electronic Resource
Chinese
European Patent Office | 2021
|Assembled corrugated steel plate partition wall construction method
European Patent Office | 2020
|Construction method of prefabricated corrugated steel web bent cap
European Patent Office | 2023
|European Patent Office | 2024
|Design method of corrugated steel plate shear wall and corrugated steel plate shear wall
European Patent Office | 2024
|