A platform for research: civil engineering, architecture and urbanism
Prefabricated reinforcement cage construction system and method for super high-rise core tube
The invention relates to a prefabricated reinforcement cage construction system and method for a super high-rise core tube, and belongs to the technical field of building engineering. The construction system comprises a steel platform, a hoisting mechanism and a translation mechanism, wherein the hoisting mechanism is fixed on the steel platform and is used for hoisting a prefabricated reinforcement cage; the translation mechanism comprises a plurality of pushing plates and a power device, the pushing plates are located on the four inner side walls of the steel platform correspondingly, and the power device is fixedly connected to the steel platform so as to be used for driving the pushing plates to be away from the inner side walls of the steel platform. The prefabricated reinforcement cage is hoisted to the position above the vertical steel bars on the core tube through the hoisting mechanism, then the pushing plate is made to move horizontally through the power device, the side face of the prefabricated reinforcement cage is pushed through movement of the pushing plate, the prefabricated reinforcement cage can be aligned with the vertical steel bars on the core tube conveniently, and the construction efficiency of the prefabricated reinforcement cage is effectively improved.
本申请涉及一种超高层核心筒的预制钢筋笼施工系统及方法,属于建筑工程技术领域。该施工系统包括钢平台、吊装机构和平移机构,所述吊装机构固定于钢平台上以用于对预制钢筋笼进行吊装;所述平移机构包括多个推动板和动力装置,多个所述推动板分别位于钢平台的四个内侧壁,所述动力装置固定连接于钢平台上以用于驱使推动板远离钢平台的内侧壁。本申请通过吊装机构将预制钢筋笼吊装至核心筒上的竖向钢筋上方,再利用动力装置使得推动板水平移动,推动板的移动将推动着预制钢筋笼的侧面,便于预制钢筋笼与核心筒上的竖向钢筋对准,有效提高预制钢筋笼的施工效率。
Prefabricated reinforcement cage construction system and method for super high-rise core tube
The invention relates to a prefabricated reinforcement cage construction system and method for a super high-rise core tube, and belongs to the technical field of building engineering. The construction system comprises a steel platform, a hoisting mechanism and a translation mechanism, wherein the hoisting mechanism is fixed on the steel platform and is used for hoisting a prefabricated reinforcement cage; the translation mechanism comprises a plurality of pushing plates and a power device, the pushing plates are located on the four inner side walls of the steel platform correspondingly, and the power device is fixedly connected to the steel platform so as to be used for driving the pushing plates to be away from the inner side walls of the steel platform. The prefabricated reinforcement cage is hoisted to the position above the vertical steel bars on the core tube through the hoisting mechanism, then the pushing plate is made to move horizontally through the power device, the side face of the prefabricated reinforcement cage is pushed through movement of the pushing plate, the prefabricated reinforcement cage can be aligned with the vertical steel bars on the core tube conveniently, and the construction efficiency of the prefabricated reinforcement cage is effectively improved.
本申请涉及一种超高层核心筒的预制钢筋笼施工系统及方法,属于建筑工程技术领域。该施工系统包括钢平台、吊装机构和平移机构,所述吊装机构固定于钢平台上以用于对预制钢筋笼进行吊装;所述平移机构包括多个推动板和动力装置,多个所述推动板分别位于钢平台的四个内侧壁,所述动力装置固定连接于钢平台上以用于驱使推动板远离钢平台的内侧壁。本申请通过吊装机构将预制钢筋笼吊装至核心筒上的竖向钢筋上方,再利用动力装置使得推动板水平移动,推动板的移动将推动着预制钢筋笼的侧面,便于预制钢筋笼与核心筒上的竖向钢筋对准,有效提高预制钢筋笼的施工效率。
Prefabricated reinforcement cage construction system and method for super high-rise core tube
一种超高层核心筒的预制钢筋笼施工系统及方法
XU LEI (author) / HE ZIYANG (author) / CHEN JIARU (author)
2024-03-26
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Butt-joint construction method for prefabricated segmented pile reinforcement cage
European Patent Office | 2024
|Construction method of super-high-rise core tube wall concrete structure
European Patent Office | 2016
|Synthesis technology of prefabricated reinforcement cage
European Patent Office | 2015
|Reversible diaphragm wall reinforcement cage prefabricated frame and construction method thereof
European Patent Office | 2023
|Construction method for postposition of stairs in super high-rise core tube
European Patent Office | 2024
|