Damper installation construction method
The invention relates to the technical field of building construction, and provides a damper installation construction method. According to the damper mounting construction method, the lower floor and the lower connecting wall are integrally and synchronously poured, the upper floor and the upper connecting wall are integrally and synchronously poured, and then the damper is mounted, so that the damper can be prevented from being damaged during concrete pouring construction, and the safety of the damper is improved; the upper connecting wall and the lower connecting wall can be fully vibrated during pouring, so that the forming quality of concrete is ensured; the pouring operation can be performed after the reinforcement cage of the lower connecting wall is mounted, and the pouring operation can be performed after the reinforcement cage of the upper connecting wall is mounted, so that the reinforcement cage of the lower connecting wall and the reinforcement cage of the upper connecting wall are prevented from moving and deforming due to long-time placement, and the reinforcement forming quality of the reinforcement cage of the lower connecting wall and the reinforcement cage of the upper connecting wall is ensured; and the stability of the damper used in a building is improved.
本公开涉及建筑施工技术领域,提供了一种阻尼器安装施工方法。该阻尼器安装施工方法将下层楼板和下连接墙一体化同步浇筑,将上层楼板和上连接墙一体化同步浇筑,然后再进行阻尼器的安装,能避免阻尼器在混凝土浇筑施工时受损,提升阻尼器的安全性,上连接墙和下连接墙浇筑时能充分振捣而保证混凝土的成型质量;下连接墙的钢筋笼安装完毕后即可进行浇筑操作,上连接墙的钢筋笼安装完毕后即可进行浇筑操作,避免下连接墙的钢筋笼和上连接墙的钢筋笼因放置时间过久而移动变形,保证下连接墙的钢筋笼和上连接墙的钢筋笼的钢筋成型质量,提升阻尼器在建筑中使用时的稳定性。
Damper installation construction method
The invention relates to the technical field of building construction, and provides a damper installation construction method. According to the damper mounting construction method, the lower floor and the lower connecting wall are integrally and synchronously poured, the upper floor and the upper connecting wall are integrally and synchronously poured, and then the damper is mounted, so that the damper can be prevented from being damaged during concrete pouring construction, and the safety of the damper is improved; the upper connecting wall and the lower connecting wall can be fully vibrated during pouring, so that the forming quality of concrete is ensured; the pouring operation can be performed after the reinforcement cage of the lower connecting wall is mounted, and the pouring operation can be performed after the reinforcement cage of the upper connecting wall is mounted, so that the reinforcement cage of the lower connecting wall and the reinforcement cage of the upper connecting wall are prevented from moving and deforming due to long-time placement, and the reinforcement forming quality of the reinforcement cage of the lower connecting wall and the reinforcement cage of the upper connecting wall is ensured; and the stability of the damper used in a building is improved.
本公开涉及建筑施工技术领域,提供了一种阻尼器安装施工方法。该阻尼器安装施工方法将下层楼板和下连接墙一体化同步浇筑,将上层楼板和上连接墙一体化同步浇筑,然后再进行阻尼器的安装,能避免阻尼器在混凝土浇筑施工时受损,提升阻尼器的安全性,上连接墙和下连接墙浇筑时能充分振捣而保证混凝土的成型质量;下连接墙的钢筋笼安装完毕后即可进行浇筑操作,上连接墙的钢筋笼安装完毕后即可进行浇筑操作,避免下连接墙的钢筋笼和上连接墙的钢筋笼因放置时间过久而移动变形,保证下连接墙的钢筋笼和上连接墙的钢筋笼的钢筋成型质量,提升阻尼器在建筑中使用时的稳定性。
Damper installation construction method
阻尼器安装施工方法
ZHANG XU (author) / BO YUEBIN (author) / JIANG ZHIQIANG (author) / YU QI (author) / GAO KAI (author) / YANG SHAOHUA (author) / JIA ZEXIN (author) / WANG CHENG (author) / SHI LIYAN (author) / LIU YINGJIE (author)
2024-03-29
Patent
Electronic Resource
Chinese