A platform for research: civil engineering, architecture and urbanism
Bridge pier column construction system
The invention provides a bridge pier column construction system which comprises an automatic formwork, an automatic hoop, an elevator main body, an elevator main platform middle guide rail and an elevator main platform lower guide rail, the automatic hoop is installed at the bottom of the automatic formwork, and the automatic hoop is used for fixing the position of the automatic formwork on a pier column. The elevator main platform middle guide rail is installed on the side wall of the automatic formwork, and the elevator main platform lower guide rail and the elevator main platform middle guide rail are connected in a sliding fit mode to form a rail for the elevator main body to climb or descend. According to the technical scheme, the construction cost of the pier column is greatly reduced, the construction efficiency is greatly improved, high-altitude operation is greatly reduced, the safety is greatly improved, and the operation environment of constructors is greatly improved.
本发明提供一种桥梁墩柱施工系统,包括自动模板、自动抱箍、升降机主体、升降机主平台中导轨和升降机主平台下导轨,所述自动抱箍安装于自动模板底部,所述自动抱箍用于对自动模板在墩柱上的位置进行固定,所述升降机主平台中导轨安装于自动模板的侧壁,所述升降机主平台下导轨和升降机主平台中导轨滑动配合连接,构成用于升降机主体爬升或下降的轨道。本技术方案,使墩柱的施工成本大幅下降,施工效率大幅提高,高空作业大幅减少、安全性大幅提高,施工人员的作业环境得到极大改善。
Bridge pier column construction system
The invention provides a bridge pier column construction system which comprises an automatic formwork, an automatic hoop, an elevator main body, an elevator main platform middle guide rail and an elevator main platform lower guide rail, the automatic hoop is installed at the bottom of the automatic formwork, and the automatic hoop is used for fixing the position of the automatic formwork on a pier column. The elevator main platform middle guide rail is installed on the side wall of the automatic formwork, and the elevator main platform lower guide rail and the elevator main platform middle guide rail are connected in a sliding fit mode to form a rail for the elevator main body to climb or descend. According to the technical scheme, the construction cost of the pier column is greatly reduced, the construction efficiency is greatly improved, high-altitude operation is greatly reduced, the safety is greatly improved, and the operation environment of constructors is greatly improved.
本发明提供一种桥梁墩柱施工系统,包括自动模板、自动抱箍、升降机主体、升降机主平台中导轨和升降机主平台下导轨,所述自动抱箍安装于自动模板底部,所述自动抱箍用于对自动模板在墩柱上的位置进行固定,所述升降机主平台中导轨安装于自动模板的侧壁,所述升降机主平台下导轨和升降机主平台中导轨滑动配合连接,构成用于升降机主体爬升或下降的轨道。本技术方案,使墩柱的施工成本大幅下降,施工效率大幅提高,高空作业大幅减少、安全性大幅提高,施工人员的作业环境得到极大改善。
Bridge pier column construction system
一种桥梁墩柱施工系统
YANG KE (author) / LUO LIANG (author) / LIU ZHIHUA (author) / QIN MINGQING (author) / LI LONG (author) / LI TIANJU (author)
2024-04-02
Patent
Electronic Resource
Chinese