Manual hole digging pile construction method
The invention provides a manual hole digging pile construction method, belongs to the technical field of hole pile construction, and comprises the steps of pile position positioning measurement and locking opening construction, hole opening arrangement, pile hole excavation, deslagging transportation, final hole detection, steel bar engineering construction, pile foundation concrete pouring, pile head breaking and removal, pile foundation detection and construction completion. The overall construction progress is greatly improved through rapid construction of the steel bars, meanwhile, automatic steel bar welding is conducted on the construction flow, the steel bar welding quality is guaranteed, the pile steel bar engineering quality is guaranteed, the excavation progress can be accelerated through a rapid excavation mode of a movable bottom bucket in the excavation composition, the pile body is automatically detected, and the construction efficiency is improved. And the construction quality is better ensured.
本发明提供人工挖孔桩施工方法,属于孔桩施工技术领域,桩位定位测量及锁口施工,孔口布置,桩孔开挖,出渣运输,终孔检测,钢筋工程施工,桩基混凝土浇筑,桩头破除,桩基进行检测完成施工。本发明通过钢筋快速施工,从而大大提升整体的施工进度,同时施工流水自动式钢筋焊接,从而保证钢筋焊接的质量,确保桩钢筋工程的质量,并且在开挖的构成中使用活底吊桶的快速开挖方式,可以加快开挖进度,并且使用自动化检测桩身,更好的确保施工质量。
Manual hole digging pile construction method
The invention provides a manual hole digging pile construction method, belongs to the technical field of hole pile construction, and comprises the steps of pile position positioning measurement and locking opening construction, hole opening arrangement, pile hole excavation, deslagging transportation, final hole detection, steel bar engineering construction, pile foundation concrete pouring, pile head breaking and removal, pile foundation detection and construction completion. The overall construction progress is greatly improved through rapid construction of the steel bars, meanwhile, automatic steel bar welding is conducted on the construction flow, the steel bar welding quality is guaranteed, the pile steel bar engineering quality is guaranteed, the excavation progress can be accelerated through a rapid excavation mode of a movable bottom bucket in the excavation composition, the pile body is automatically detected, and the construction efficiency is improved. And the construction quality is better ensured.
本发明提供人工挖孔桩施工方法,属于孔桩施工技术领域,桩位定位测量及锁口施工,孔口布置,桩孔开挖,出渣运输,终孔检测,钢筋工程施工,桩基混凝土浇筑,桩头破除,桩基进行检测完成施工。本发明通过钢筋快速施工,从而大大提升整体的施工进度,同时施工流水自动式钢筋焊接,从而保证钢筋焊接的质量,确保桩钢筋工程的质量,并且在开挖的构成中使用活底吊桶的快速开挖方式,可以加快开挖进度,并且使用自动化检测桩身,更好的确保施工质量。
Manual hole digging pile construction method
人工挖孔桩施工方法
HUANG ZHEJUN (author) / LI PANPAN (author) / XU BO (author) / BO RUIFEI (author) / LIU GENSHEN (author) / ZHANG HAO (author) / ZHENG FAN (author) / ZHAO SHIWEI (author) / LIANG SHIHAN (author)
2024-04-05
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Manual hole digging pile and construction method of manual hole digging pile
European Patent Office | 2020
|Construction method of manual hole digging pile and manual hole digging pile
European Patent Office | 2021
|Manual hole digging pile and construction method of manual hole digging pile
European Patent Office | 2020
|