A platform for research: civil engineering, architecture and urbanism
Prefabricated and assembled reinforced concrete pool and construction method thereof
The invention relates to the technical field of oil and gas field station areas and pipeline engineering, in particular to a prefabricated and assembled reinforced concrete pool and a construction method thereof.The prefabricated and assembled reinforced concrete pool comprises a prefabricated bottom plate surrounding a circle, a middle prefabricated pool wall surrounding a circle, a top prefabricated pool wall surrounding a circle and a prefabricated top cover, and the top of the prefabricated bottom plate is provided with an upturning section; the prefabricated reinforced concrete pool has the advantages that the hidden danger of cracking and water seepage of the reinforced concrete pool can be greatly reduced through concave-convex tongue-and-groove seam connection and sealant pouring in the seam, and the problems that the cast-in-place quality is poor, the construction cost is low and the like can be solved by adopting prefabricated components. The problems of insufficient maintenance, more cracks of the pool wall and the bottom plate and water seepage of the pool wall are solved, and the construction progress is greatly improved. According to the construction method, the site construction period is shortened by about 20 days, and the width of a foundation trench excavation working face is reduced. And the adverse effect of the concrete foundation construction process on the environment is greatly reduced.
本发明涉及油气田站区及管道工程技术领域,是一种预制拼装钢筋混凝土水池及其施工方法,前者包括围成一圈的预制底板、围成一圈的中部预制池壁、围成一圈的顶部预制池壁和预制顶盖,在预制底板的顶部设有上翻段,在上翻段的中部设有插槽,在中部预制池壁的底部设有密封插在上翻段的插槽内的插块,本发明具有以下效果:通过凹凸企口缝连接,缝内灌注密封胶能极大降低钢筋混凝土水池开裂渗水的隐患,采用预制各部件,能解决现场浇筑质量差,养护不到位,池壁及底板裂缝多,池壁渗水的问题,还极大提高了施工进度。该施工方法缩短现场施工周期20天左右,减少了基槽开挖作业面的宽度。大大降低了混凝土基础施工过程对环境的不利影响。
Prefabricated and assembled reinforced concrete pool and construction method thereof
The invention relates to the technical field of oil and gas field station areas and pipeline engineering, in particular to a prefabricated and assembled reinforced concrete pool and a construction method thereof.The prefabricated and assembled reinforced concrete pool comprises a prefabricated bottom plate surrounding a circle, a middle prefabricated pool wall surrounding a circle, a top prefabricated pool wall surrounding a circle and a prefabricated top cover, and the top of the prefabricated bottom plate is provided with an upturning section; the prefabricated reinforced concrete pool has the advantages that the hidden danger of cracking and water seepage of the reinforced concrete pool can be greatly reduced through concave-convex tongue-and-groove seam connection and sealant pouring in the seam, and the problems that the cast-in-place quality is poor, the construction cost is low and the like can be solved by adopting prefabricated components. The problems of insufficient maintenance, more cracks of the pool wall and the bottom plate and water seepage of the pool wall are solved, and the construction progress is greatly improved. According to the construction method, the site construction period is shortened by about 20 days, and the width of a foundation trench excavation working face is reduced. And the adverse effect of the concrete foundation construction process on the environment is greatly reduced.
本发明涉及油气田站区及管道工程技术领域,是一种预制拼装钢筋混凝土水池及其施工方法,前者包括围成一圈的预制底板、围成一圈的中部预制池壁、围成一圈的顶部预制池壁和预制顶盖,在预制底板的顶部设有上翻段,在上翻段的中部设有插槽,在中部预制池壁的底部设有密封插在上翻段的插槽内的插块,本发明具有以下效果:通过凹凸企口缝连接,缝内灌注密封胶能极大降低钢筋混凝土水池开裂渗水的隐患,采用预制各部件,能解决现场浇筑质量差,养护不到位,池壁及底板裂缝多,池壁渗水的问题,还极大提高了施工进度。该施工方法缩短现场施工周期20天左右,减少了基槽开挖作业面的宽度。大大降低了混凝土基础施工过程对环境的不利影响。
Prefabricated and assembled reinforced concrete pool and construction method thereof
预制拼装钢筋混凝土水池及其施工方法
SUN HAITAO (author) / LEI JIANGHUI (author) / LI JINSHENG (author) / LI TAO (author) / SHI RUNJIE (author) / LI HAIBO (author) / TANG GE (author) / LIU CHANGZHI (author) / CHEN MIN (author) / CHEN KEWEI (author)
2024-04-05
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Prefabricated reinforced concrete variable component assembled house and construction method thereof
European Patent Office | 2022
|Prefabricated concrete pool wallboard structure and construction method thereof
European Patent Office | 2021
|Prefabricated assembled concrete trestle and construction method thereof
European Patent Office | 2022
|PREFABRICATED ASSEMBLED REINFORCED CONCRETE RETAINING WALL AND CONSTRUCTION METHOD THEREFOR
European Patent Office | 2024
|Assembled prefabricated wall concrete slab and construction method thereof
European Patent Office | 2021
|