Fabricated basement outer wall construction method
The invention discloses an assembly type basement exterior wall construction method which comprises the following steps that S1, a basement exterior wall is prefabricated in a factory, and the basement exterior wall comprises a bearing primary wall and an assembly secondary wall; s2, a raft foundation is constructed, and inserting ribs and retaining wall bosses are prefabricated at the position, where the basement outer wall needs to be installed, of the upper surface of the raft foundation; s3, the bearing mother wall is hoisted in place, the bearing mother wall is connected with the raft foundation, and meanwhile the retaining wall boss abuts against the root of the bearing mother wall; s4, the assembly child wall and the bearing mother wall are positioned in a matched mode, and a grid framework structure for connecting the adjacent wall bodies is formed; s5, formworks are erected on the inner sides of the bearing primary wall and the assembly secondary wall, concrete is poured into the pouring reserved area, and the bearing primary wall and the assembly secondary wall are connected into a whole; and S6, a wall waterproof layer and a waterproof protection layer are sequentially constructed on the outer sides of the bearing mother wall and the assembly child wall. According to the construction method, the construction efficiency can be greatly improved, the construction period is shortened, and the fabricated building quality is guaranteed.
本发明公开了一种装配式地下室外墙施工方法,包括如下步骤:S1、在工厂内预制地下室外墙,地下室外墙包括承重母墙和装配子墙;S2、施工筏板基础,在筏板基础上表面需要安装地下室外墙的位置预制有插接筋和挡墙凸台;S3、将承重母墙吊装到位,使承重母墙与筏板基础连接,同时挡墙凸台抵住承重母墙墙根部;S4、将装配子墙与承重母墙配合定位,形成连接相邻墙体的网格骨架结构;S5、在承重母墙和装配子墙内侧支设模板,向浇注预留区内浇注混凝土,将承重母墙与装配子墙连接为一体;S6、在承重母墙和装配子墙外侧依次施工墙防水层和防水保护层。本施工方法能大大提高施工效率,缩短施工周期,且保证装配式建筑质量。
Fabricated basement outer wall construction method
The invention discloses an assembly type basement exterior wall construction method which comprises the following steps that S1, a basement exterior wall is prefabricated in a factory, and the basement exterior wall comprises a bearing primary wall and an assembly secondary wall; s2, a raft foundation is constructed, and inserting ribs and retaining wall bosses are prefabricated at the position, where the basement outer wall needs to be installed, of the upper surface of the raft foundation; s3, the bearing mother wall is hoisted in place, the bearing mother wall is connected with the raft foundation, and meanwhile the retaining wall boss abuts against the root of the bearing mother wall; s4, the assembly child wall and the bearing mother wall are positioned in a matched mode, and a grid framework structure for connecting the adjacent wall bodies is formed; s5, formworks are erected on the inner sides of the bearing primary wall and the assembly secondary wall, concrete is poured into the pouring reserved area, and the bearing primary wall and the assembly secondary wall are connected into a whole; and S6, a wall waterproof layer and a waterproof protection layer are sequentially constructed on the outer sides of the bearing mother wall and the assembly child wall. According to the construction method, the construction efficiency can be greatly improved, the construction period is shortened, and the fabricated building quality is guaranteed.
本发明公开了一种装配式地下室外墙施工方法,包括如下步骤:S1、在工厂内预制地下室外墙,地下室外墙包括承重母墙和装配子墙;S2、施工筏板基础,在筏板基础上表面需要安装地下室外墙的位置预制有插接筋和挡墙凸台;S3、将承重母墙吊装到位,使承重母墙与筏板基础连接,同时挡墙凸台抵住承重母墙墙根部;S4、将装配子墙与承重母墙配合定位,形成连接相邻墙体的网格骨架结构;S5、在承重母墙和装配子墙内侧支设模板,向浇注预留区内浇注混凝土,将承重母墙与装配子墙连接为一体;S6、在承重母墙和装配子墙外侧依次施工墙防水层和防水保护层。本施工方法能大大提高施工效率,缩短施工周期,且保证装配式建筑质量。
Fabricated basement outer wall construction method
装配式地下室外墙施工方法
ZHANG ZHAOQING (author) / WANG JUN (author) / YANG CHUN (author) / YANG HUA (author) / ZHANG ZHAORUI (author)
2024-04-09
Patent
Electronic Resource
Chinese
Basement outer wall multi-layer waterproof construction method
European Patent Office | 2024
|