Integrated rail changing method and rail changing unit
The embodiment of the invention provides an integrated rail switching method and a rail switching unit. The rail changing method comprises the steps that a rail shifting trolley clamps a steel rail head to move in the longitudinal direction so as to drag a steel rail in the longitudinal direction; a lifting mechanism of the rail shifting trolley lifts the steel rail in the vertical direction; a transverse moving mechanism of the rail shifting trolley moves the steel rail in the transverse direction; and the rail shifting trolley converts the new rail from the transportation and storage position of the integrated rail switching unit to the line placement position, and converts the old rail from the line placement position to the transportation and storage position of the integrated rail switching unit. The construction organization mode that transportation, unloading and replacement of a new rail and recycling of an old rail are completed in one skylight point can be achieved, the problem that a long rail is stored on a line is solved, protection work of storage of the steel rail on the line is reduced, and potential safety hazards of storage of the steel rail on the line are eliminated.
本申请实施例提供一种一体化换轨方法及换轨机组;其中换轨方法包括拨轨小车夹住钢轨头沿纵向方向移动以将钢轨沿纵向方向拖拽;拨轨小车的提升机构将钢轨沿垂向方向进行升降;拨轨小车的横移机构将钢轨沿横向方向进行移动;拨轨小车将新轨道由一体化换轨机组的运输、存储位置变换到线路摆放位置,以及将旧轨道由线路摆放位置变换到一体化换轨机组的运输、存储位置。本申请能够实现在一个天窗点内完成新轨道的运输、卸载、更换和旧轨道回收的施工组织模式,避免了长轨道在线路存放的问题,减少钢轨在线路存放的防护工作,消除了线路存放钢轨的安全隐患。
Integrated rail changing method and rail changing unit
The embodiment of the invention provides an integrated rail switching method and a rail switching unit. The rail changing method comprises the steps that a rail shifting trolley clamps a steel rail head to move in the longitudinal direction so as to drag a steel rail in the longitudinal direction; a lifting mechanism of the rail shifting trolley lifts the steel rail in the vertical direction; a transverse moving mechanism of the rail shifting trolley moves the steel rail in the transverse direction; and the rail shifting trolley converts the new rail from the transportation and storage position of the integrated rail switching unit to the line placement position, and converts the old rail from the line placement position to the transportation and storage position of the integrated rail switching unit. The construction organization mode that transportation, unloading and replacement of a new rail and recycling of an old rail are completed in one skylight point can be achieved, the problem that a long rail is stored on a line is solved, protection work of storage of the steel rail on the line is reduced, and potential safety hazards of storage of the steel rail on the line are eliminated.
本申请实施例提供一种一体化换轨方法及换轨机组;其中换轨方法包括拨轨小车夹住钢轨头沿纵向方向移动以将钢轨沿纵向方向拖拽;拨轨小车的提升机构将钢轨沿垂向方向进行升降;拨轨小车的横移机构将钢轨沿横向方向进行移动;拨轨小车将新轨道由一体化换轨机组的运输、存储位置变换到线路摆放位置,以及将旧轨道由线路摆放位置变换到一体化换轨机组的运输、存储位置。本申请能够实现在一个天窗点内完成新轨道的运输、卸载、更换和旧轨道回收的施工组织模式,避免了长轨道在线路存放的问题,减少钢轨在线路存放的防护工作,消除了线路存放钢轨的安全隐患。
Integrated rail changing method and rail changing unit
一种一体化换轨方法及换轨机组
TAO XIAOHU (author) / CHEN YUESHUN (author) / TANG MINGMING (author) / HUANG QIONGYA (author) / WU YUXIANG (author) / FANG JUN (author)
2024-04-26
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Rail changing machine wheel, rail changing machine and rail finding method
European Patent Office | 2020
|Rail changing operation vehicle and rail changing system
European Patent Office | 2024
|Rail changing tool and rail changing method for aerial rail transportation system
European Patent Office | 2024
|High-speed railway integrated rail changing train arrangement structure and rail changing method
European Patent Office | 2022
|