Basement outer wall waterproof protection layer formwork device and construction method
The invention relates to the technical field of basement exterior wall waterproofing, in particular to a basement exterior wall waterproof protection layer formwork device and a construction method, comprising a steel formwork, a connecting rod connected with a support rod, a threaded rod connected with a connecting block, a connecting shaft connected with a spring I and a fixed plate, an inserting rod connected with a pressing rod, and a movable block connected with a spring II; the positions of the bases are determined, the pressing rods are pressed to enable the inserting rods to be separated from the fixing plates, then the connecting shafts are pulled, the connecting rods on one side are placed between the bases, the connecting shafts are loosened firstly, then the pressing rods are loosened, the other sides are connected through the first bolts and the first nuts, the opposite ends of the supporting rods are connected through the threaded rods, the handles are rotated to enable the supporting rods to move till the requirements are met, and the next steel formwork is fixed. The guide grooves are aligned with the guide rods for insertion and are fixed through bolts and nuts, and concrete is poured after the guide grooves are sequentially installed and checked to be correct, so that the waterproof layer is better protected, the waterproof layer is prevented from being damaged in the construction process, the waterproof layer is prevented from being cracked due to settlement of backfill soil, and leakage is avoided.
本发明涉及地下室外墙防水技术领域,具体为一种地下室外墙防水保护层模板装置及施工方法,包括:钢模板,连接杆连接有支撑杆,螺纹杆连接有连接块,连接轴连接有弹簧一和固定板,插杆连接有压杆,活动块连接有弹簧二;确定底座位置,按压压杆使插杆脱离固定板,再拉动连接轴,将一侧的连接杆放底座之间,先松开连接轴,再松开压杆,另一侧用螺栓一和螺母一连接,支撑杆相向一端用螺纹杆连接,转动把手使支撑杆活动直至满足要求,对下一块钢模板固定,将导向槽对准导向杆插接,并用螺栓螺母固定,依次安装检查无误后,浇筑混凝土,从而对防水层起到更好的保护,避免施工过程破坏防水层,也避免回填土沉降拉裂防水层,避免出现渗漏。
Basement outer wall waterproof protection layer formwork device and construction method
The invention relates to the technical field of basement exterior wall waterproofing, in particular to a basement exterior wall waterproof protection layer formwork device and a construction method, comprising a steel formwork, a connecting rod connected with a support rod, a threaded rod connected with a connecting block, a connecting shaft connected with a spring I and a fixed plate, an inserting rod connected with a pressing rod, and a movable block connected with a spring II; the positions of the bases are determined, the pressing rods are pressed to enable the inserting rods to be separated from the fixing plates, then the connecting shafts are pulled, the connecting rods on one side are placed between the bases, the connecting shafts are loosened firstly, then the pressing rods are loosened, the other sides are connected through the first bolts and the first nuts, the opposite ends of the supporting rods are connected through the threaded rods, the handles are rotated to enable the supporting rods to move till the requirements are met, and the next steel formwork is fixed. The guide grooves are aligned with the guide rods for insertion and are fixed through bolts and nuts, and concrete is poured after the guide grooves are sequentially installed and checked to be correct, so that the waterproof layer is better protected, the waterproof layer is prevented from being damaged in the construction process, the waterproof layer is prevented from being cracked due to settlement of backfill soil, and leakage is avoided.
本发明涉及地下室外墙防水技术领域,具体为一种地下室外墙防水保护层模板装置及施工方法,包括:钢模板,连接杆连接有支撑杆,螺纹杆连接有连接块,连接轴连接有弹簧一和固定板,插杆连接有压杆,活动块连接有弹簧二;确定底座位置,按压压杆使插杆脱离固定板,再拉动连接轴,将一侧的连接杆放底座之间,先松开连接轴,再松开压杆,另一侧用螺栓一和螺母一连接,支撑杆相向一端用螺纹杆连接,转动把手使支撑杆活动直至满足要求,对下一块钢模板固定,将导向槽对准导向杆插接,并用螺栓螺母固定,依次安装检查无误后,浇筑混凝土,从而对防水层起到更好的保护,避免施工过程破坏防水层,也避免回填土沉降拉裂防水层,避免出现渗漏。
Basement outer wall waterproof protection layer formwork device and construction method
一种地下室外墙防水保护层模板装置及施工方法
TANG BO (author) / HU WEIPENG (author) / LYU ZHIPENG (author) / ZHANG ZHITAO (author) / BI JUNWEI (author) / WANG DONG (author) / TANG HUA (author) / WANG YAWEI (author) / GUO HAOBIN (author) / LI SHUAI (author)
2024-05-14
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for waterproof protection layer of basement outer wall
European Patent Office | 2023
|Basement outer wall multi-layer waterproof construction method
European Patent Office | 2024
|Basement outer wall unilateral formwork reinforcing construction method
European Patent Office | 2024
|