A platform for research: civil engineering, architecture and urbanism
Combined chute and construction method thereof
The invention discloses a combined torrent chute and a construction method thereof. The combined torrent chute comprises waterproof cloth used for guiding flow, and the waterproof cloth is laid in the length direction of a chute body excavated in advance; the U-shaped plates are arranged above the waterproof cloth in a pressing mode so that the waterproof cloth can be attached to the interior of the groove body in an abutting mode, the number of the U-shaped plates is multiple, and the U-shaped plates are arranged in the length direction of the groove body at intervals; the limiting pieces are used for clamping and fixing the U-shaped plates in the groove body, each U-shaped plate is connected with the corresponding limiting piece, and the construction efficiency is improved by arranging the combined torrent groove.
本发明公开了一种组合式急流槽及其施工方法,所述组合式急流槽包括:用于导流的防水布,所述防水布沿预先开挖的槽体的长度方向铺设;压设在所述防水布上方以将所述防水布贴抵至所述槽体内的U型板,所述U型板的数量为多个,多个所述U型板沿所述槽体的长度方向间隔设置;用于将所述U型板卡固在所述槽体内的限位件,每个所述U型板上均连接有所述限位件,通过设置所述组合式急流槽提高了施工效率。
Combined chute and construction method thereof
The invention discloses a combined torrent chute and a construction method thereof. The combined torrent chute comprises waterproof cloth used for guiding flow, and the waterproof cloth is laid in the length direction of a chute body excavated in advance; the U-shaped plates are arranged above the waterproof cloth in a pressing mode so that the waterproof cloth can be attached to the interior of the groove body in an abutting mode, the number of the U-shaped plates is multiple, and the U-shaped plates are arranged in the length direction of the groove body at intervals; the limiting pieces are used for clamping and fixing the U-shaped plates in the groove body, each U-shaped plate is connected with the corresponding limiting piece, and the construction efficiency is improved by arranging the combined torrent groove.
本发明公开了一种组合式急流槽及其施工方法,所述组合式急流槽包括:用于导流的防水布,所述防水布沿预先开挖的槽体的长度方向铺设;压设在所述防水布上方以将所述防水布贴抵至所述槽体内的U型板,所述U型板的数量为多个,多个所述U型板沿所述槽体的长度方向间隔设置;用于将所述U型板卡固在所述槽体内的限位件,每个所述U型板上均连接有所述限位件,通过设置所述组合式急流槽提高了施工效率。
Combined chute and construction method thereof
组合式急流槽及其施工方法
WU DAREN (author) / FU WEISHU (author) / CHEN QINGJIE (author) / CHENG HAILIN (author) / LIANG DONGJING (author) / LI HANJIE (author) / ZHANG CHUANQI (author) / LI DEHAI (author)
2024-05-14
Patent
Electronic Resource
Chinese
Mass concrete articulated chute pouring system and construction method thereof
European Patent Office | 2021
|Chute-des-passes: construction drama
Engineering Index Backfile | 1957
|