A platform for research: civil engineering, architecture and urbanism
Anti-skid demolding construction device and method for bridge bent cap hoop
The invention provides an anti-skid demolding construction device and method for a bridge cover beam hoop, the anti-skid demolding construction device comprises a movable hoop and a fixed hoop, a plurality of mounting grooves are formed in the inner wall of the movable hoop, expansion bags are arranged in the mounting grooves, hydraulic quick connectors are arranged on the expansion bags, and the hydraulic quick connectors penetrate through the movable hoop to extend to the outside of the hoop; a rubber pad is arranged on the inner wall of the fixed hoop, and the fixed hoop and the movable hoop are connected through a plurality of hydraulic cylinders; a construction frame is arranged above the movable hoop, and the construction frame and the formwork are of an integrated structure. And the expansion bag shrinks and controls the movable hoop to stably descend through the hydraulic cylinder, so that synchronous descending with the integrated structure of the template and the scaffold is realized. By means of the design, the demolding process is simplified, it is guaranteed that demolding work of the bent cap is conducted smoothly, the labor intensity of workers is reduced, the construction efficiency and safety are improved, and the good anti-skid demolding construction effect is achieved.
本发明提供一种桥梁盖梁抱箍的防滑脱模施工装置及其施工方法,包括活动抱箍和固定抱箍,活动抱箍内壁开设有多个安装槽,安装槽内部设置有膨胀囊,膨胀囊上设置有液压快速接头,液压快速接头穿过活动抱箍延伸到抱箍外部;固定抱箍内壁设有橡胶垫,固定抱箍与活动抱箍之间通过多个液压缸连接;活动抱箍上方设有施工架,施工架与模板为一体结构。膨胀囊收缩并通过液压缸控制活动抱箍平稳下降,实现了与模板及施工架一体化结构同步下降。这一设计简化了脱模过程,确保了盖梁脱模工作的顺利进行,降低了工人的劳动强度,提高了施工效率与安全性,达到了良好的防滑脱模施工效果。
Anti-skid demolding construction device and method for bridge bent cap hoop
The invention provides an anti-skid demolding construction device and method for a bridge cover beam hoop, the anti-skid demolding construction device comprises a movable hoop and a fixed hoop, a plurality of mounting grooves are formed in the inner wall of the movable hoop, expansion bags are arranged in the mounting grooves, hydraulic quick connectors are arranged on the expansion bags, and the hydraulic quick connectors penetrate through the movable hoop to extend to the outside of the hoop; a rubber pad is arranged on the inner wall of the fixed hoop, and the fixed hoop and the movable hoop are connected through a plurality of hydraulic cylinders; a construction frame is arranged above the movable hoop, and the construction frame and the formwork are of an integrated structure. And the expansion bag shrinks and controls the movable hoop to stably descend through the hydraulic cylinder, so that synchronous descending with the integrated structure of the template and the scaffold is realized. By means of the design, the demolding process is simplified, it is guaranteed that demolding work of the bent cap is conducted smoothly, the labor intensity of workers is reduced, the construction efficiency and safety are improved, and the good anti-skid demolding construction effect is achieved.
本发明提供一种桥梁盖梁抱箍的防滑脱模施工装置及其施工方法,包括活动抱箍和固定抱箍,活动抱箍内壁开设有多个安装槽,安装槽内部设置有膨胀囊,膨胀囊上设置有液压快速接头,液压快速接头穿过活动抱箍延伸到抱箍外部;固定抱箍内壁设有橡胶垫,固定抱箍与活动抱箍之间通过多个液压缸连接;活动抱箍上方设有施工架,施工架与模板为一体结构。膨胀囊收缩并通过液压缸控制活动抱箍平稳下降,实现了与模板及施工架一体化结构同步下降。这一设计简化了脱模过程,确保了盖梁脱模工作的顺利进行,降低了工人的劳动强度,提高了施工效率与安全性,达到了良好的防滑脱模施工效果。
Anti-skid demolding construction device and method for bridge bent cap hoop
桥梁盖梁抱箍的防滑脱模施工装置及其施工方法
XIANG QIANJUN (author) / XU DAN (author) / ZHANG SHIKUI (author) / ZENG ZHONGXIAO (author) / ZHANG HONGJUN (author) / WANG HANLIN (author) / FENG LIAN (author)
2024-05-24
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Double-hoop bent cap construction platform and construction method
European Patent Office | 2023
|Hoop part for bridge construction and bridge construction device
European Patent Office | 2023
|Shear-resistant bent cap hoop and filling construction method thereof
European Patent Office | 2024
|Concrete demolding device for road and bridge construction
European Patent Office | 2023
|