Construction method of highway bridge
The invention discloses a construction method of a highway bridge, and relates to the technical field of bridge construction. The construction method comprises the steps that a temporary supporting structure is arranged, the temporary supporting structure comprises a pouring space penetrating in the vertical direction, and a reinforcing structure is arranged in the pouring space; the connecting ends of two beam bodies are erected on the supporting structure, and the connecting ends of the two beam bodies are arranged at intervals and located on the two sides of the pouring space correspondingly to form a connecting space; a connecting agent is poured, the pouring space and the connecting space are sequentially filled with the connecting agent, a permanent supporting structure is formed after the connecting agent is solidified, and the two beam bodies are bonded and fixed through the connecting agent; and the temporary supporting structure is dismantled, and pavement construction is conducted on the bridge deck. According to the construction method of the highway bridge, the construction period is shortened, the efficiency is improved, the connecting strength and stability between the bridge body and the bridge pier are improved, and the service life is prolonged.
本发明公开了一种公路桥梁的施工方法,涉及桥梁施工技术领域。该施工方法包括设置临时支撑结构,所述临时支撑结构包括沿竖直方向贯通的浇筑空间,所述浇筑空间内设置有加强结构;将两根梁体的连接端搭设于所述支撑结构,两根所述梁体的连接端间隔设置且分别位于所述浇筑空间的两侧以形成连接空间;浇筑连接剂,使所述连接剂依次填充所述浇筑空间和所述连接空间,所述连接剂凝固后形成永久支撑结构,所述连接剂粘接固定两根所述梁体;拆除所述临时支撑结构,对桥面进行铺装施工。该公路桥梁的施工方法缩短了工期,提高了效率,且提高了梁体和桥墩之间的连接强度和稳定性,提高了使用寿命。
Construction method of highway bridge
The invention discloses a construction method of a highway bridge, and relates to the technical field of bridge construction. The construction method comprises the steps that a temporary supporting structure is arranged, the temporary supporting structure comprises a pouring space penetrating in the vertical direction, and a reinforcing structure is arranged in the pouring space; the connecting ends of two beam bodies are erected on the supporting structure, and the connecting ends of the two beam bodies are arranged at intervals and located on the two sides of the pouring space correspondingly to form a connecting space; a connecting agent is poured, the pouring space and the connecting space are sequentially filled with the connecting agent, a permanent supporting structure is formed after the connecting agent is solidified, and the two beam bodies are bonded and fixed through the connecting agent; and the temporary supporting structure is dismantled, and pavement construction is conducted on the bridge deck. According to the construction method of the highway bridge, the construction period is shortened, the efficiency is improved, the connecting strength and stability between the bridge body and the bridge pier are improved, and the service life is prolonged.
本发明公开了一种公路桥梁的施工方法,涉及桥梁施工技术领域。该施工方法包括设置临时支撑结构,所述临时支撑结构包括沿竖直方向贯通的浇筑空间,所述浇筑空间内设置有加强结构;将两根梁体的连接端搭设于所述支撑结构,两根所述梁体的连接端间隔设置且分别位于所述浇筑空间的两侧以形成连接空间;浇筑连接剂,使所述连接剂依次填充所述浇筑空间和所述连接空间,所述连接剂凝固后形成永久支撑结构,所述连接剂粘接固定两根所述梁体;拆除所述临时支撑结构,对桥面进行铺装施工。该公路桥梁的施工方法缩短了工期,提高了效率,且提高了梁体和桥墩之间的连接强度和稳定性,提高了使用寿命。
Construction method of highway bridge
一种公路桥梁的施工方法
2024-05-24
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Engineering Index Backfile | 1924
|Highway bridge deck construction method of highway-railway dual-purpose bridge
European Patent Office | 2021
|