The invention discloses a triangular hanging basket curve walking method, and relates to the technical field of suspended casting construction. The triangular hanging basket curve walking method comprises the steps that the position where a hanging basket moves forwards in place is obtained according to a BIM model, and the forward moving route of the hanging basket is determined after lofting; two guide rails parallel to the forward moving line are installed on the poured concrete beam section, and a moving assembly moving along the guide rails is installed on the two guide rails; the moving assembly is connected with a middle main longitudinal beam of the middle truss; and pulling the hanging basket to move forwards by adopting traction equipment. According to the triangular hanging basket curve walking method provided by the embodiment of the invention, under the cooperation of the guide rail and the moving assembly, the hanging basket can walk according to the designed forward moving line, the stability of the hanging basket in the walking process can be guaranteed, the hanging basket is prevented from sideslip, the safety is high, accurate in-place forward moving of the hanging basket can be achieved, deviation correction is not needed, the walking efficiency is improved, and consumed time is short.
本申请公开了一种三角挂篮曲线行走方法,涉及悬浇施工技术领域。该三角挂篮曲线行走方法,包括:根据BIM模型获取挂篮前移就位后所处的位置,经放样后确定挂篮的前移线路;在已浇筑的混凝土梁段上安装两个与前移线路相平行的导轨,两个导轨上安装有沿导轨移动的移动组件;将移动组件与中间桁架的中间主纵梁连接;再采用牵引设备牵引挂篮前移。本申请实施例提供的三角挂篮曲线行走方法,在导轨与移动组件的配合下,可使挂篮按照设计的前移线路行走,既可保证挂篮行走过程中的稳定性,防止挂篮侧滑,安全性高,又可实现挂篮前移的精确就位,无需纠偏,提高了行走效率,耗时短。
Triangular hanging basket curve walking method
The invention discloses a triangular hanging basket curve walking method, and relates to the technical field of suspended casting construction. The triangular hanging basket curve walking method comprises the steps that the position where a hanging basket moves forwards in place is obtained according to a BIM model, and the forward moving route of the hanging basket is determined after lofting; two guide rails parallel to the forward moving line are installed on the poured concrete beam section, and a moving assembly moving along the guide rails is installed on the two guide rails; the moving assembly is connected with a middle main longitudinal beam of the middle truss; and pulling the hanging basket to move forwards by adopting traction equipment. According to the triangular hanging basket curve walking method provided by the embodiment of the invention, under the cooperation of the guide rail and the moving assembly, the hanging basket can walk according to the designed forward moving line, the stability of the hanging basket in the walking process can be guaranteed, the hanging basket is prevented from sideslip, the safety is high, accurate in-place forward moving of the hanging basket can be achieved, deviation correction is not needed, the walking efficiency is improved, and consumed time is short.
本申请公开了一种三角挂篮曲线行走方法,涉及悬浇施工技术领域。该三角挂篮曲线行走方法,包括:根据BIM模型获取挂篮前移就位后所处的位置,经放样后确定挂篮的前移线路;在已浇筑的混凝土梁段上安装两个与前移线路相平行的导轨,两个导轨上安装有沿导轨移动的移动组件;将移动组件与中间桁架的中间主纵梁连接;再采用牵引设备牵引挂篮前移。本申请实施例提供的三角挂篮曲线行走方法,在导轨与移动组件的配合下,可使挂篮按照设计的前移线路行走,既可保证挂篮行走过程中的稳定性,防止挂篮侧滑,安全性高,又可实现挂篮前移的精确就位,无需纠偏,提高了行走效率,耗时短。
Triangular hanging basket curve walking method
一种三角挂篮曲线行走方法
WANG YUAN (author) / LUO LI (author) / LIU WEIHUA (author) / QIN YONGKE (author) / WANG JIALIN (author)
2024-05-28
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Trackless triangular hanging basket walking device and walking method
European Patent Office | 2023
|Walking hanging basket and installing method of walking hanging basket
European Patent Office | 2015
|Front fulcrum hanging basket and hanging basket walking method
European Patent Office | 2023
|