Wind power prestress foundation pile capable of avoiding stress concentration and preparation method of wind power prestress foundation pile
The invention discloses a wind power prestress foundation pile capable of avoiding stress concentration and a preparation method thereof, and relates to the field of wind power project foundations, the foundation pile comprises a pile bottom plate and a plurality of engineering piles located at the bottom of the pile bottom plate, the engineering piles are arranged in an annular array with the center of the pile bottom plate as the circle center, and the engineering piles comprise at least two types with different lengths; the end, away from the pile bottom plate, of the engineering pile goes deep into the ground and forms an expanded end at the end, a pile end grouting pipe and a pile side grouting pipe are arranged in the engineering pile, and the pile end grouting pipe extends into the expanded end to form a pile end grouting pipe nipple with a valve. The pile side grouting pipes comprise at least two hole bottom grouting pipes arranged in the height direction of the pile bottom plate and at least one hole side annular grouting pipe arranged around the peripheral side of the pile bottom plate. Concentrated stress can be avoided, and the service life of a built structure is prolonged; the arrangement of engineering piles can be reduced under the condition of the same bearing capacity, or the pile length or the pile diameter can be reduced under the condition of the same pile number, materials are saved, and meanwhile the construction efficiency is improved.
本发明公开一种避免应力集中风电预应力基础桩及其制备方法,涉及风电项目基础领域,基础桩包括桩底板和位于桩底板底部的多根工程桩,工程桩以桩底板中心为圆心环形阵列布置,工程桩包括长度不同的至少两种型号,工程桩远离桩底板的一端深入地底并在端部形成扩大端,工程桩内设置有桩端注浆管和桩侧注浆管,桩端注浆管伸入扩大端形成桩端压浆带阀短节,桩侧注浆管包括沿桩底板高度方向布置的至少两根孔底注浆管和绕桩底板周侧布置的至少一个孔侧环形注浆管。本发明能够避免集中受力,延长其上建构筑物的寿命;同样承载力条件下可以减少工程桩的布置,或者同样桩数条件下可减少桩长或桩径,节约用料的同时有助于提高施工效率。
Wind power prestress foundation pile capable of avoiding stress concentration and preparation method of wind power prestress foundation pile
The invention discloses a wind power prestress foundation pile capable of avoiding stress concentration and a preparation method thereof, and relates to the field of wind power project foundations, the foundation pile comprises a pile bottom plate and a plurality of engineering piles located at the bottom of the pile bottom plate, the engineering piles are arranged in an annular array with the center of the pile bottom plate as the circle center, and the engineering piles comprise at least two types with different lengths; the end, away from the pile bottom plate, of the engineering pile goes deep into the ground and forms an expanded end at the end, a pile end grouting pipe and a pile side grouting pipe are arranged in the engineering pile, and the pile end grouting pipe extends into the expanded end to form a pile end grouting pipe nipple with a valve. The pile side grouting pipes comprise at least two hole bottom grouting pipes arranged in the height direction of the pile bottom plate and at least one hole side annular grouting pipe arranged around the peripheral side of the pile bottom plate. Concentrated stress can be avoided, and the service life of a built structure is prolonged; the arrangement of engineering piles can be reduced under the condition of the same bearing capacity, or the pile length or the pile diameter can be reduced under the condition of the same pile number, materials are saved, and meanwhile the construction efficiency is improved.
本发明公开一种避免应力集中风电预应力基础桩及其制备方法,涉及风电项目基础领域,基础桩包括桩底板和位于桩底板底部的多根工程桩,工程桩以桩底板中心为圆心环形阵列布置,工程桩包括长度不同的至少两种型号,工程桩远离桩底板的一端深入地底并在端部形成扩大端,工程桩内设置有桩端注浆管和桩侧注浆管,桩端注浆管伸入扩大端形成桩端压浆带阀短节,桩侧注浆管包括沿桩底板高度方向布置的至少两根孔底注浆管和绕桩底板周侧布置的至少一个孔侧环形注浆管。本发明能够避免集中受力,延长其上建构筑物的寿命;同样承载力条件下可以减少工程桩的布置,或者同样桩数条件下可减少桩长或桩径,节约用料的同时有助于提高施工效率。
Wind power prestress foundation pile capable of avoiding stress concentration and preparation method of wind power prestress foundation pile
避免应力集中风电预应力基础桩及其制备方法
HE SHIMING (author) / SONG YOUHONG (author) / YANG GENSHENG (author) / YAO HUALI (author) / GUO DANGSHENG (author) / WANG ZHIJUN (author) / ZHANG YUPING (author) / LI JUN (author) / YUE ZHONGJIE (author) / YU HEKUN (author)
2024-05-28
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Offshore wind power prestress UHPC large-diameter thin-wall single pile foundation
European Patent Office | 2024
|Prestress stiffening steel reinforced concrete high pile cap foundation of wind power tower
European Patent Office | 2023
|Soft geological prestress pile foundation measuring device
European Patent Office | 2021
|Recyclable land wind power foundation prestress spiral anchor rod structure
European Patent Office | 2021
|