A platform for research: civil engineering, architecture and urbanism
Construction equipment and method for cutting pile head of concrete prefabricated tubular pile
The invention discloses construction equipment and method for cutting a pile head of a concrete prefabricated pipe pile, and belongs to the technical field of concrete pipe pile cutting. The construction equipment comprises a movable trolley, stand columns are fixedly installed at the four corners of the upper surface of the movable trolley, a movable groove is formed in the inner side of each stand column, and a lifting mechanism is arranged on the upper surface of the movable trolley; a lifting mechanism is arranged on the upper surface of the movable cart, a lifting plate is fixedly connected to the lifting mechanism, clamping mechanisms are arranged at the same ends of the lifting plate and the movable cart, a moving mechanism is arranged at one end of the upper surface of the lifting plate, the moving mechanism is located above the clamping mechanisms, and an inner supporting mechanism is arranged on the moving mechanism. The pipe pile is fixed again, meanwhile, concrete in the pipe pile after pile cutting is conveniently taken out, the trouble of manually taking the concrete in the pipe pile is reduced, and the pile cutting efficiency is improved.
本发明公开了一种混凝土预制管桩截桩头的施工设备及方法,属于混凝土管桩截桩技术领域,包括移动推车,所述移动推车上表面四角处均固定安装有立柱,每个所述立柱内侧均开设有活动槽,所述移动推车上表面设置有升降机构,所述升降机构上固定连接有升降板,所述升降板和移动推车的同一端均设置有夹持机构,所述升降板上表面一端设置有移动机构,所述移动机构位于夹持机构上方,所述移动机构上设置有内撑机构,该发明通过内撑机构的设置,不仅对管桩起到再次固定的作用,同时也便于取出截桩后的管桩内部混凝土,降低了人工取内部混凝土的麻烦,提高截桩效率。
Construction equipment and method for cutting pile head of concrete prefabricated tubular pile
The invention discloses construction equipment and method for cutting a pile head of a concrete prefabricated pipe pile, and belongs to the technical field of concrete pipe pile cutting. The construction equipment comprises a movable trolley, stand columns are fixedly installed at the four corners of the upper surface of the movable trolley, a movable groove is formed in the inner side of each stand column, and a lifting mechanism is arranged on the upper surface of the movable trolley; a lifting mechanism is arranged on the upper surface of the movable cart, a lifting plate is fixedly connected to the lifting mechanism, clamping mechanisms are arranged at the same ends of the lifting plate and the movable cart, a moving mechanism is arranged at one end of the upper surface of the lifting plate, the moving mechanism is located above the clamping mechanisms, and an inner supporting mechanism is arranged on the moving mechanism. The pipe pile is fixed again, meanwhile, concrete in the pipe pile after pile cutting is conveniently taken out, the trouble of manually taking the concrete in the pipe pile is reduced, and the pile cutting efficiency is improved.
本发明公开了一种混凝土预制管桩截桩头的施工设备及方法,属于混凝土管桩截桩技术领域,包括移动推车,所述移动推车上表面四角处均固定安装有立柱,每个所述立柱内侧均开设有活动槽,所述移动推车上表面设置有升降机构,所述升降机构上固定连接有升降板,所述升降板和移动推车的同一端均设置有夹持机构,所述升降板上表面一端设置有移动机构,所述移动机构位于夹持机构上方,所述移动机构上设置有内撑机构,该发明通过内撑机构的设置,不仅对管桩起到再次固定的作用,同时也便于取出截桩后的管桩内部混凝土,降低了人工取内部混凝土的麻烦,提高截桩效率。
Construction equipment and method for cutting pile head of concrete prefabricated tubular pile
一种混凝土预制管桩截桩头的施工设备及方法
TANG YONG (author) / XIE PEIQI (author) / WANG MIN (author) / TANG XUEPING (author) / ZHOU BINNAN (author)
2024-05-28
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Prefabricated tubular pile implanting equipment and pile implanting construction method
European Patent Office | 2020
|Prefabricated tubular pile head core grouting construction method
European Patent Office | 2024
|European Patent Office | 2023
|Prefabricated tubular pile construction robot and tubular pile pressing method thereof
European Patent Office | 2023
|