Construction method for connecting column side purline and concrete column
The invention discloses a construction method for connecting a column side purline and a concrete column, which comprises the following steps: binding reinforcing steel bars in the concrete column, the reinforcing steel bars comprising main reinforcements and stirrups bound on the main reinforcements; embedded parts are installed on the steel bars, embedded part anchor bars of the embedded parts are inserted into the main bars, the inner sides of embedded plates of the embedded parts and the stirrups are welded through the connecting steel bars, and the arrangement positions of the embedded parts enable the outer side wall faces of the embedded plates of the embedded parts to be attached to the inner wall of a formwork of the concrete column; a formwork of the concrete column is installed, so that the inner wall of the formwork is attached to the outer side wall face of the embedded plate of the embedded part; concrete is poured into the formwork, and the formwork is dismantled; and the connecting column side purline is welded to the outer side wall face of the embedded plate of the embedded part. According to the method, the embedded part and the reinforcing steel bars are welded and fixed through the connecting reinforcing steel bars, so that the embedded part can be fixed, the situation that the embedded part shakes when concrete is poured in the later period is avoided, the outer side wall face of the embedded plate of the embedded part is attached to the inner wall of the formwork, the outer side wall face of the embedded plate is flush with the wall face of a protective layer after the formwork is removed, the construction efficiency is improved, and the application prospect is good.
本发明公开了一种连接柱侧檩条与混凝土柱的施工方法,步骤:绑扎混凝土柱内的钢筋,钢筋包括主筋和绑扎在主筋上的箍筋;在钢筋上安装预埋件,将预埋件的埋件锚筋插入主筋内利用连接钢筋将预埋件的埋板内侧与箍筋焊接,预埋件的布置位置使得预埋件的埋板外侧壁面与混凝土柱的模板内壁贴合;安装混凝土柱的模板使得模板内壁与预埋件的埋板外侧壁面贴合;向模板内浇筑混凝土,拆除模板;将连接柱侧檩条与预埋件的埋板外侧壁面焊接。本发明的方法,利用连接钢筋将预埋件与钢筋焊接固定即可固定预埋件,避免后期浇筑混凝土预埋件发生晃动,使预埋件的埋板外侧壁面与模板内壁贴合,拆除模板后埋板外侧壁面与保护层壁面平齐,提高施工效率,应用前景好。
Construction method for connecting column side purline and concrete column
The invention discloses a construction method for connecting a column side purline and a concrete column, which comprises the following steps: binding reinforcing steel bars in the concrete column, the reinforcing steel bars comprising main reinforcements and stirrups bound on the main reinforcements; embedded parts are installed on the steel bars, embedded part anchor bars of the embedded parts are inserted into the main bars, the inner sides of embedded plates of the embedded parts and the stirrups are welded through the connecting steel bars, and the arrangement positions of the embedded parts enable the outer side wall faces of the embedded plates of the embedded parts to be attached to the inner wall of a formwork of the concrete column; a formwork of the concrete column is installed, so that the inner wall of the formwork is attached to the outer side wall face of the embedded plate of the embedded part; concrete is poured into the formwork, and the formwork is dismantled; and the connecting column side purline is welded to the outer side wall face of the embedded plate of the embedded part. According to the method, the embedded part and the reinforcing steel bars are welded and fixed through the connecting reinforcing steel bars, so that the embedded part can be fixed, the situation that the embedded part shakes when concrete is poured in the later period is avoided, the outer side wall face of the embedded plate of the embedded part is attached to the inner wall of the formwork, the outer side wall face of the embedded plate is flush with the wall face of a protective layer after the formwork is removed, the construction efficiency is improved, and the application prospect is good.
本发明公开了一种连接柱侧檩条与混凝土柱的施工方法,步骤:绑扎混凝土柱内的钢筋,钢筋包括主筋和绑扎在主筋上的箍筋;在钢筋上安装预埋件,将预埋件的埋件锚筋插入主筋内利用连接钢筋将预埋件的埋板内侧与箍筋焊接,预埋件的布置位置使得预埋件的埋板外侧壁面与混凝土柱的模板内壁贴合;安装混凝土柱的模板使得模板内壁与预埋件的埋板外侧壁面贴合;向模板内浇筑混凝土,拆除模板;将连接柱侧檩条与预埋件的埋板外侧壁面焊接。本发明的方法,利用连接钢筋将预埋件与钢筋焊接固定即可固定预埋件,避免后期浇筑混凝土预埋件发生晃动,使预埋件的埋板外侧壁面与模板内壁贴合,拆除模板后埋板外侧壁面与保护层壁面平齐,提高施工效率,应用前景好。
Construction method for connecting column side purline and concrete column
一种连接柱侧檩条与混凝土柱的施工方法
MENG QINGWEI (author) / YU KUN (author) / HU YUBO (author)
2024-05-31
Patent
Electronic Resource
Chinese
European Patent Office | 2020
|Purline with double-layer flanges and preparation method of purline
European Patent Office | 2022
|Purline with double-layer flanges and preparation method of purline
European Patent Office | 2023
|